Australia, New Zealand and the United States · WS-1.7

Programme Rules and Governance

WaterSwap’s own voluntary framework: informed by published evidence, accountable in its decisions and open to improvement.

Applications open · credit sales not yet available.

Applications and enquiries are open. Live credit issuance, sales and retirement remain disabled until eligible methodologies, independently verified inventory and tested registry and transaction safeguards are in place.

This framework governs screening and programme development. It is not government accreditation, legal clearance or an approved credit calculation methodology.

Owner provides evidence

Project owners provide existing independent audit of their metered volumes, or commission and pay a panel verifier where the risk-based rules require one.

WaterSwap owns the rules

We adopt our voluntary framework, explain our evidence and decisions, and publish revisions. We do not claim regulatory authority.

Evidence before issuance

Independent project verification remains essential. An application, internal review or draft specimen is not an issued water credit.

1. Scope and status

WaterSwap aims to build an internationally credible voluntary water-benefit programme, starting in Australia, New Zealand and the United States. International partnership and buyer enquiries are welcome; project applications currently cover Australia, New Zealand and the United States only. Expansion requires jurisdiction-specific scientific and legal review, approved methodologies and local safeguards. WaterSwap owns and adopts this voluntary governance and application-screening framework. It is not a government-authorised regulatory or offset scheme; it does not override applicable laws, permits or third-party rights. Adoption of this framework is not approval of a credit calculation methodology. Project registration, an enquiry, a pledge or a draft certificate does not create a water credit. No affiliation, accreditation or endorsement by ISO, WRI or another standard owner is claimed.

2. Buyer briefs and project matching

WaterSwap works on behalf of large water users, such as data centres, to find suitable projects, in the way a recruitment agency works for an employer. A buyer may submit a brief describing its sites, catchments, reporting frameworks and additional criteria. Project owners carry the onus of demonstrating, with evidence, that their project meets the WaterSwap minimum and a brief. WaterSwap may present matching projects to a buyer as a shortlist. Buyer criteria may add requirements or narrow a portfolio; they never lower the WaterSwap minimum. Buyers choose which eligible projects to support, but do not decide eligibility, verified quantities or programme rules. WaterSwap’s commercial relationship with buyers must not influence eligibility decisions. A match, shortlist or expression of interest is not credit issuance or a purchase commitment. Research performance alone never generates credits.

3. Accountability and conflicts of interest

WaterSwap management owns the programme, approves its rules and is accountable for their application. WaterSwap has a commercial interest in future credit sales; that interest must not determine eligibility or verified quantities. Record financial, ownership and advisory conflicts for each decision. Anyone with a project-specific conflict must withdraw from the decision. Before issuance begins, name an authorised decision-maker separated from project development and sales and record their approval reasons. Where no unconflicted decision-maker is available, pause the decision and arrange independent escalation. Independent project verification is separate from WaterSwap rule ownership; no external governance board or accreditation is claimed.

4. Evidence, assumptions and limitations

Use published scientific guidance and official regulatory guidance as evidence, not as endorsement or a substitute for project-specific advice. Record source titles, versions or publication dates, the provisions used, local applicability and departures in each methodology. Legal commentary is not advice specifically given to WaterSwap. General reference guidance below does not yet establish a complete credit methodology. No universal conversion factor, credit denomination or desalination eligibility formula is settled. Update evidence openly as knowledge develops; unresolved material uncertainty prevents issuance for the affected activity.

5. Units and local relevance

Water-volume benefits and water-quality improvements are different products. Volumetric calculations should report m³; pollutant reductions should report the identified pollutant and mass. There is no approved WaterSwap credit denomination or conversion factor yet. Do not treat water from different catchments, time periods or benefit types as interchangeable. Volume alone does not establish a broader ecological outcome.

6. Eligibility and additionality

Require documented rights to deliver and assign the benefit, valid local consents, a mapped boundary, a conservative baseline, additionality, funding attribution and no duplicate claims. Disclose public funding and legally required activities. Reject unsupported ownership, overlapping claims and benefits already assigned elsewhere. Existing projects require evidence that any proposed credited component is genuinely additional. Additionality ruling: WaterSwap credits only water that would not exist, or would not remain in the environment, without the buyer’s support. Being new is not enough on its own; a new plant, scheme or works already approved and funded would occur anyway and is not additional. Every credited activity must pass five tests. (1) Defined activity: a specific activity and benefit period is assessed, never the whole output of a facility. (2) Conservative baseline: a credible without-support scenario is evidenced from metered records, budgets and operating plans, and the lower figure is used where doubt remains. (3) Not required or already paid for: anything required by law, licence, consent or contract, or already funded by tariffs, budgets, grants or supply contracts, is excluded. (4) Support makes the difference: open-book evidence must show the buyer’s contribution enables the activity to proceed, to be larger, or to occur earlier; only the enabled increment or the brought-forward period is credited. (5) Claimed once: the same benefit may not be claimed on another registry, sold to another party or counted in another party’s reported claim. Where several parties fund an activity, a buyer’s credited share is proportional to its contribution unless the other funders waive their claim in writing. Contributions that are repaid or earn a commercial return reduce or remove the credited share. Credits are measured in water, never in dollars contributed. A common-practice check applies: where most comparable facilities in the region already undertake the activity, it is treated as business as usual unless strong evidence shows otherwise. A buyer that uses the funded water itself is purchasing supply, not an offset; the same water cannot be both. Every decision records which tests were passed and why, and is re-tested at renewal; a benefit credited in one period cannot be credited again. Research performance alone never generates credits.

7. Public utilities and existing assets

Screening policy: public ownership, public co-funding or an existing asset is not an automatic exclusion. Assess a defined activity and benefit period, not the ownership category or the entire plant. New capacity, efficiency upgrades or continued operation may be considered only where evidence shows a positive change against a credible without-support scenario. Review committed budgets, grants, tariffs, supply contracts, operating obligations and other claims. Funding allocation alone does not prove additionality. Do not sell routine, already-funded or already-assigned outcomes again. Continued-operation (avoided-loss) claims carry a heightened burden of proof: require audited or independently reviewed financial statements and an open-book cash-flow forecast showing a shortfall that would cause shutdown or material output loss within a defined period, or a formal closure, decommissioning or service-reduction notice or resolution. Show that tariff, budget, insurance, warranty, grant and lender options have been considered. Routine or scheduled maintenance, maintenance the operator is already obliged or funded to perform, and cost overruns do not qualify. Credited quantities are limited to output that would otherwise be lost during the supported period, and support must be tied to the specific works or operation identified. Where compliance duties are involved, document the genuinely incremental component and seek targeted specialist advice on material unresolved questions; no automatic exemption applies. WaterSwap makes the eligibility decision and records its evidence and reasoning.

8. Desalination and data-centre partnerships

Desalination proposals may enter screening; this is not approval for credits. Define the benefit being claimed: improved water access, increased supply resilience or reduced freshwater pressure must not be conflated. Where freshwater displacement is claimed, demonstrate the reduction in abstraction or consumption, its location, timing, beneficiaries and durability; desalinated output alone is insufficient. A displacement claim also requires an enforceable mechanism, for the whole benefit period, that prevents the conserved freshwater being taken up by another user: for example a recorded forbearance or non-use agreement, a dedication or transfer to instream or environmental flow, a permanent or term reduction in a licence or allocation, or documented retention under an adjudicated-basin or groundwater-sustainability accounting framework, as applicable in the jurisdiction. The mechanism must be capable of independent verification. Without it, the benefit may be described only as supply resilience or improved access, not freshwater displacement. Assess intake impacts, brine and chemical discharges, energy and emissions, community access, permits and monitoring. Brine and other discharges must hold current permits from the relevant authorities (in California, for example, discharge permits and the State Water Resources Control Board’s Ocean Plan desalination requirements), supported by recent compliance monitoring; unresolved material non-compliance prevents eligibility. Report the energy source, energy intensity (kWh per m³) and associated emissions. Water benefits and emissions are not netted against each other: energy impacts are disclosed alongside the water claim, a project must not be described as low-emission or carbon-neutral unless separately evidenced, and buyers remain responsible for their own emissions accounting. A data centre buying its normal water supply does not automatically create a separate offset. Distinguish contractual or approval-related obligations from voluntary contributions, account for new demand and backup supplies, and document who may claim each benefit. Consider recycled water and demand reduction alongside desalination; choose the option supported by local evidence. Every credit carries a benefit label, such as improved water access, supply resilience or freshwater retained in a named catchment. Buyers may only make claims matching that label and location: a water-access benefit in one region cannot be presented as offsetting water use in another catchment. Desalination applications are decided by WaterSwap’s Head of Programme Integrity. Each applicant receives the decision and written reasons identifying the tests passed or failed, and the decision and reasons are archived unchanged. An applicant may appeal through the published grievance process.

9. Measurement and methodology

WaterSwap is responsible for adopting project-type-specific equations, data sources, counterfactual assumptions, uncertainty deductions, leakage, attribution and monitoring using documented scientific evidence. Publish the sources, units, applicability and limitations with each method. External approval of the entire rulebook is not required by this framework. Independent project verification must still assess whether the method is appropriate and the claimed calculation is supported. Where science is unresolved, defer the activity rather than invent a conversion factor. Estimated future benefits must be kept separate from measured benefits. Proposed issuance is ex-post only, after independent verification of the specified benefit period. No arbitrary conversion of restoration hectares or pollutant mass into water volume is permitted. Reference accounting method for volume benefits: WaterSwap adopts the World Resources Institute’s Volumetric Water Benefit Accounting 2.0 (VWBA 2.0, September 2025) as its reference method for quantifying volumetric water benefits. Applicants claiming a volume benefit must identify the VWBA 2.0 activity type, indicator and calculation used, and report the benefit in m³ for a named catchment and a stated benefit period. VWBA 2.0 governs how a volume is quantified only. It does not decide eligibility: every credited activity must still pass all five additionality tests, rights, consents and safeguard checks, and independent verification, and the conservative baseline and proportional-share rules apply to the quantified volume. Where VWBA 2.0 and these rules differ, the stricter requirement applies. VWBA benefits in different catchments or benefit periods are not added together, water-quality benefits are not converted into volume, and VWBA does not supply a universal conversion factor. A project-specific WaterSwap methodology must still be adopted before issuance. Use of VWBA 2.0 does not imply endorsement by WRI.

10. Verification and governance

Risk-based verification: every credited volume must be backed by an independent check before issuance, but that check need not always be a panel verifier engaged for WaterSwap. Route A (existing independent assurance): a panel verifier is not required only where all of the following apply: (1) the claimed volume comes from metered data that has already been independently checked, such as an Auditor-General or state audit office audit, metered returns audited by a water regulator under a licence, or audited annual reporting covering the specific metered volume; (2) WaterSwap can trace the claimed volume to that assured data for the same site and benefit period; and (3) no Route B trigger applies. Government or utility ownership does not qualify a project for Route A on its own; the existing assurance does. Route B (panel verifier required): the owner must commission a panel verifier, or a non-panel firm meeting every panel admission test, where any of the following applies: screening raises an alert, such as missing or unchecked evidence, inconsistent figures, or doubts about rights, consents or safeguards; no existing independent assurance covers the claimed volume; the claim relies on modelling or estimates rather than metered data; the claim is for continued operation (avoided loss); the claim is for desalination freshwater displacement; several funders share the activity and a proportional share must be calculated; the owner is a private entity with no audited reporting of the volume; or the project is selected for a random check. Random checks (WS-1.7): so that Route A cannot be used to avoid scrutiny, each calendar year WaterSwap selects 10% of Route A projects, or at least one project in any year with a Route A project, whichever is greater, for verification by a panel verifier. Every Route A project has the same chance of selection; there is no risk weighting. Each project is drawn when it is accepted into Route A. Before the first draw of each year WaterSwap publishes the SHA-256 fingerprint of a secret random number; a project is selected where the HMAC-SHA256 of its WaterSwap reference, keyed with that number and read as a whole number, falls in the lowest 10% of possible values (25% in a year when the higher rate applies). After the year ends WaterSwap publishes the secret number so anyone can confirm the fingerprint and every result. If fewer projects than required have been selected by 31 December, the shortfall is drawn by the same method from every Route A project active that year and checked for its current monitoring period, or the next one if the current period has been issued. WaterSwap records the date, inputs and result of every draw and publishes the number of projects checked each year, without naming them. A selected owner must engage a panel verifier, or a non-panel firm meeting every admission test, under the full panel rules; no credits are issued for the selected period until the check is complete, and an owner who refuses or does not arrange the check moves to Route B. If the check confirms the claimed volume, the project stays on Route A and credits are issued only for the confirmed volume. A material error, meaning an overstatement of more than 5% or assured data that does not support the claim, means no credits for the overstated volume, correction of any credits already issued under the published correction process, the owner’s other projects moving to Route B until a verifier has confirmed one monitoring period for each, written reasons on record, and a 25% sampling rate (with the same floor) for the following calendar year. Random-check costs: the owner engages and pays the verifier directly and the fee must not depend on the outcome. If the check confirms the claimed volume, WaterSwap repays the verifier’s invoiced fee, on production of the invoice, by reducing its commission on that project’s credit sales, sale by sale, until the fee is recovered or three years have passed since the check, whichever comes first. Repayment is limited to the commission WaterSwap earns on that project’s sales; WaterSwap makes no other payment, the owner’s own time and costs are not repaid, nothing is repaid after a material error, and repayments are shown on each sale statement. Existing assurance confirms a volume; it does not prove additionality, and all five additionality tests, rights, consents and safeguard checks apply to every project on either route. WaterSwap records which route was used and why, may move a project from Route A to Route B at any time before issuance if a trigger arises, and every future certificate will state its verification route. Under Route B, the project owner is responsible for commissioning and paying a competent independent verifier and providing the signed report, credential evidence and underlying data. Under Route A, the owner provides the assurance report and underlying metered data, and WaterSwap confirms the report with its issuer. WaterSwap must check report authenticity with the verifier, credential validity and relevant scope, independence, the methodology used and closure of material findings. A separate authorised decision-maker considers issuance. Payment by the owner must be disclosed; contingent fees and verification of a verifier’s own project work are not acceptable under this framework. There is no assumed universal water-credit verifier licence: applicable licensing, accreditation or scheme approval must be checked for the jurisdiction and method. Owner-provided certification does not automatically qualify a project or transfer WaterSwap’s responsibility for its issuance decision. Approved verifier panel: WaterSwap keeps a panel of independent verification firms so that every eligible project can obtain a qualified, unconflicted verifier. A firm is admitted only when WaterSwap has checked and recorded: (1) current accreditation to ISO 14065 or ISO/IEC 17029 (or a successor) from a national accreditation body that signs the IAF multilateral recognition arrangement, such as JAS-ANZ, ANAB or UKAS, with the certificate and scope schedule on file; (2) written confirmation of whether verification against these rules and WRI VWBA 2.0 falls within that accreditation and, if not, the basis on which assurance is given (for example ASAE 3000 or ISAE 3000), which is published next to the firm’s name; (3) a documented impartiality policy; (4) the countries where it can provide verifiers with relevant water or hydrology competence; (5) an indicative fee basis, so small and community projects can see likely costs early; and (6) a signed panel agreement. Panel membership is not exclusive; WaterSwap pays panel firms nothing for referrals and firms pay nothing to be listed. Membership is reviewed every year, and immediately if accreditation is suspended, withdrawn or narrowed. The project owner chooses a panel firm, contracts and pays it directly, and nominates it to WaterSwap; the nomination is confirmed only after the firm signs a project-specific conflict declaration. An owner may propose a firm outside the panel, but it must meet every admission test for that project; there is no easier route. If no unconflicted firm is available, the project waits; the rules are not relaxed. A firm may not verify a project if it or a related entity has, in the previous three years, designed, built, operated, advised on or prepared the application for the project; carried out laboratory testing, sampling, metering or engineering inspection whose results form part of the claimed benefit; developed the methodology applied; had a financial interest in the project, its owner or buyers of its credits; or been engaged by WaterSwap on any matter other than panel administration. Fees contingent on the quantity verified or on credits being issued are prohibited. A firm may verify at most five consecutive monitoring periods for the same project; a different firm must then verify at least one period before it may return. A panel firm’s report does not by itself qualify a project: for every report WaterSwap confirms authenticity directly with the firm, the signatory’s competence and the firm’s accreditation scope on the signing date, the conflict declaration and rotation rule, the methodology used and closure of all material findings, and records its own decision and reasons. Issuance remains a separate decision by an authorised decision-maker and stays disabled until WaterSwap opens it under updated rules. A firm that loses or narrows its accreditation, breaches the conflict rules, refuses authenticity checks or issues a materially wrong report may be suspended or removed; projects it verified are re-examined and credits withheld until resolved. WaterSwap publishes the panel list, each firm’s accreditation body and assurance basis, and admission and removal dates, but not fees agreed between owners and verifiers. No firm is named as a panel member until it has been admitted under these tests.

11. Australian, New Zealand and United States checks

Assess project-specific obligations using applicable official guidance and scientific evidence; obtain targeted advice when a material question remains unresolved. In Australia, assess relevant state/territory water rights, planning/environmental approvals and Aboriginal and Torres Strait Islander interests. In New Zealand, assess applicable resource consents, water rights and Māori, iwi and hapū rights and interests. In the United States, water law differs by state: assess the applicable state water rights and permits (for example, State Water Resources Control Board requirements in California), federal and state discharge and environmental permits including those covering desalination intake and brine, and Tribal water rights and interests. This framework does not determine consent requirements or substitute for required engagement, permits or project-specific legal advice.

12. Safeguards and grievances

Evaluate downstream effects, biodiversity, water access, displacement and impacts on communities before acceptance. Record consultation and unresolved concerns. Complaints may be submitted through the contact form with the project reference. WaterSwap management is accountable for receiving and assigning complaints. Record the issue, evidence, conflicts, decision and reasons; an appeal must be considered by someone not involved in the original decision. Before sales begin, publish the responsible roles and response timetable and arrange independent escalation where an unconflicted reviewer is unavailable. No response deadline is currently promised.

13. Registry and issuance controls

The intended live registry must link every serialised unit to a project, methodology/version, geography, benefit period, verified quantity and supporting report. It must prevent over-issuance, duplicate period allocation and double retirement, with transactional reconciliation and an audit history. The current platform stores screening records and private draft certificates only; live issuance, transfers and retirement are not implemented or enabled.

14. Certificates and permitted claims

A future claim certificate should identify the beneficiary and specific retired units, with a public status record and carefully qualified claim wording. Retirement—not a pledge or a printable document—would be the basis for an exclusive benefit claim. Do not claim carbon neutrality, water neutrality, water positivity, regulatory compliance or a water entitlement merely by holding a certificate. Even verified volume is not proof of equivalence to a buyer’s footprint.

15. Benefit periods and renewal

Record the actual start and end dates of the benefit period separately from the certificate issue date. A 12-month reporting cycle may be adopted after review, but it must not recycle an already claimed benefit. Renewal, if offered, requires newly eligible and verified benefits and new retirement records. No automatic renewals or payments are enabled; term and commercial policy remain to be decided.

16. Corrections, reversals and continuity

When credible evidence challenges a benefit, pause the affected application or, once transactions exist, the affected unsold inventory and issuance while investigating. Preserve the original evidence, record the findings and correction, notify affected parties, and disclose material registry status changes without exposing private data. Replacement or refund obligations must be established in sale terms before any purchase; this framework does not invent an unconditional guarantee or waive statutory rights. Set any uncertainty or reversal buffer from evidence, not by copying another programme. Preserve original records and append corrections; never silently rewrite issued certificates. Finalise operational cancellation, notification, backup and registry continuity procedures before sales.

17. Version control and next steps

WS-1.7 sets the random-check rules for Route A projects: 10% a year or at least one project, a draw fixed in advance and open to public checking, a 25% rate for the following year after a material error (an overstatement of more than 5%), and repayment of the verifier fee for a check that confirms the claimed volume through reduced WaterSwap commission on that project, capped at the commission earned and limited to three years. All other rules are unchanged. WS-1.7 retains in full WS-1.6, which adopted risk-based verification. A panel verifier is not required where the claimed volume comes from metered data already independently assured (for example by an Auditor-General audit, regulator-audited metered returns or audited annual reporting), WaterSwap can trace the claim to that data, and no Route B trigger applies. A panel verifier remains required where screening raises an alert, assurance is absent, volumes are modelled or estimated, or the claim involves continued operation, desalination displacement, shared funding, a private owner without audited reporting, or selection for a random check. This replaces the WS-1.5 requirement that every project commission a verifier; every credited volume still needs an independent check before issuance, and all other rules are unchanged. WS-1.6 retains in full WS-1.5, which adopted the approved verifier panel (admission tests, owner choice and direct payment, project-specific conflict declarations, a three-year conflict lookback, rotation after five consecutive periods, WaterSwap checks on every report and removal rules), WS-1.4, which adopted WRI Volumetric Water Benefit Accounting 2.0 as the reference method for quantifying volume benefits only, and the WS-1.3 additionality ruling (five tests for every credited activity, proportional crediting where funding is shared, a common-practice check, benefit labels limiting claims to the benefit type and location, and written, archived reasons for desalination decisions) and the WS-1.2 requirements for public utilities, continued-operation claims and desalination. Approved by WaterSwap management 23 November 2026; applies to new submissions using this version when published. WS-1.6, WS-1.5, WS-1.4, WS-1.3, WS-1.2, WS-1.1, WS-1.0 and earlier drafts are preserved unchanged in the archive. No effective issuance date has been set. WaterSwap management approves revisions with documented evidence, reasons, effective scope and transition arrangements. Publish a version number, effective date and change summary and preserve the previous rules before a revision takes effect. Earlier applications retain their recorded version unless amended and resubmitted; migration requires a recorded explanation and notice. Future issued batches must retain their original rule and methodology versions. Later changes must not silently rewrite purchases or extinguish rights; corrections follow the published correction process. Public feedback informs decisions but does not give any contributor a veto. Whole-rulebook external approval is not a condition of revision; independent project verification and applicable legal requirements remain mandatory.

Before the first issued credit

These operational safeguards remain outstanding. Publishing our framework does not mean they have been completed. External approval of the entire rulebook is not a blanket prerequisite.

  1. Confirm the issuing legal entity, governance, insurance and contractual responsibilities in Australia, New Zealand and the United States.
  2. WaterSwap must adopt and publish a versioned, evidence-based methodology for each eligible benefit type and jurisdiction, with equations, source references, assumptions and limitations. Exclude activities where a defensible method is not established.
  3. Admit at least one independent verification firm to the approved verifier panel under the WS-1.5 admission tests, publish the fingerprint of the year’s secret number under the WS-1.7 random-check rules before the first Route A draw, and appoint an issuance decision-maker separated from project development and sales.
  4. Document applicable requirements for claims, permits, benefit ownership, consumer rights, taxation and any financial-services implications. Resolve material legal uncertainties through targeted advice where needed; whole-rulebook external approval is not a WaterSwap prerequisite.
  5. Validate a real pilot with monitoring data, additionality, safeguards, independent verification and closed findings.
  6. Implement and independently test live serial allocation, quantity reconciliation, transfers, irreversible retirement, corrections and reversal handling before enabling issuance.
  7. Approve buyer contracts, permitted claims, complaints/appeals arrangements, fees and a continuity plan for registry records.

Revision history and archived rules

Rule owner and approving authority: WaterSwap management. Approved 23 November 2026. WS-1.7 applies to new applications using this version when published; it does not authorise issuance or retrospectively approve earlier applications. WS-1.7 sets the random-check rules for Route A projects while keeping risk-based verification, an independent check on every credited volume and every other earlier minimum standard.

WS-1.7 · Random checks of Route A projects

Adopted

Each year WaterSwap sends 10% of Route A projects, or at least one project, whichever is greater, to a panel verifier for a full check. Every Route A project has the same chance of selection; there is no risk weighting. The draw is fixed in advance and can be checked publicly: WaterSwap publishes a fingerprint of the year’s secret number before the first draw and reveals the number after the year ends. A selected project receives no credits until the check is complete, and an owner who refuses moves to Route B. A material error, meaning an overstatement of more than 5%, leads to corrections, moves the owner’s other projects to Route B and raises the rate to 25% for the next year. The owner pays the verifier a fee that does not depend on the result. If the check passes, WaterSwap repays that fee by reducing the commission on that project’s sales, capped at the commission earned and for up to three years. Nothing is repaid after a material error.

Panel status: no firms have been admitted yet. WaterSwap plans to approach accredited firms; a firm will be listed here only after it meets every admission test and signs the panel agreement. The fingerprint for each year’s draw will be published before the first Route A draw.

WS-1.6 · Risk-based verification (archived)

Adopted . Superseded by WS-1.7 for new submissions using that version. Its Route A and Route B rules are carried forward unchanged into WS-1.7; WS-1.7 adds the random-check rate, method and cost rule. Preserved unchanged below.

Every credited volume still needs an independent check before issuance, but not every project must hire a verifier. Route A: where the claimed volume comes from metered data already independently assured, such as an Auditor-General audit, regulator-audited metered returns or audited annual reporting, and WaterSwap can trace the claim to that data, no panel verifier is needed. Route B: a panel verifier is required where screening raises an alert, no assurance exists, volumes are modelled or estimated, or the claim involves continued operation, desalination displacement, shared funding or a private owner without audited reporting. WaterSwap also sends a random sample of Route A projects to a panel verifier. Government ownership alone does not qualify for Route A, the five additionality tests apply on both routes, and every future certificate will state its verification route.

Scope and status

WaterSwap aims to build an internationally credible voluntary water-benefit programme, starting in Australia, New Zealand and the United States. International partnership and buyer enquiries are welcome; project applications currently cover Australia, New Zealand and the United States only. Expansion requires jurisdiction-specific scientific and legal review, approved methodologies and local safeguards. WaterSwap owns and adopts this voluntary governance and application-screening framework. It is not a government-authorised regulatory or offset scheme; it does not override applicable laws, permits or third-party rights. Adoption of this framework is not approval of a credit calculation methodology. Project registration, an enquiry, a pledge or a draft certificate does not create a water credit. No affiliation, accreditation or endorsement by ISO, WRI or another standard owner is claimed.

Buyer briefs and project matching

WaterSwap works on behalf of large water users, such as data centres, to find suitable projects, in the way a recruitment agency works for an employer. A buyer may submit a brief describing its sites, catchments, reporting frameworks and additional criteria. Project owners carry the onus of demonstrating, with evidence, that their project meets the WaterSwap minimum and a brief. WaterSwap may present matching projects to a buyer as a shortlist. Buyer criteria may add requirements or narrow a portfolio; they never lower the WaterSwap minimum. Buyers choose which eligible projects to support, but do not decide eligibility, verified quantities or programme rules. WaterSwap’s commercial relationship with buyers must not influence eligibility decisions. A match, shortlist or expression of interest is not credit issuance or a purchase commitment. Research performance alone never generates credits.

Accountability and conflicts of interest

WaterSwap management owns the programme, approves its rules and is accountable for their application. WaterSwap has a commercial interest in future credit sales; that interest must not determine eligibility or verified quantities. Record financial, ownership and advisory conflicts for each decision. Anyone with a project-specific conflict must withdraw from the decision. Before issuance begins, name an authorised decision-maker separated from project development and sales and record their approval reasons. Where no unconflicted decision-maker is available, pause the decision and arrange independent escalation. Independent project verification is separate from WaterSwap rule ownership; no external governance board or accreditation is claimed.

Evidence, assumptions and limitations

Use published scientific guidance and official regulatory guidance as evidence, not as endorsement or a substitute for project-specific advice. Record source titles, versions or publication dates, the provisions used, local applicability and departures in each methodology. Legal commentary is not advice specifically given to WaterSwap. General reference guidance below does not yet establish a complete credit methodology. No universal conversion factor, credit denomination or desalination eligibility formula is settled. Update evidence openly as knowledge develops; unresolved material uncertainty prevents issuance for the affected activity.

Units and local relevance

Water-volume benefits and water-quality improvements are different products. Volumetric calculations should report m³; pollutant reductions should report the identified pollutant and mass. There is no approved WaterSwap credit denomination or conversion factor yet. Do not treat water from different catchments, time periods or benefit types as interchangeable. Volume alone does not establish a broader ecological outcome.

Eligibility and additionality

Require documented rights to deliver and assign the benefit, valid local consents, a mapped boundary, a conservative baseline, additionality, funding attribution and no duplicate claims. Disclose public funding and legally required activities. Reject unsupported ownership, overlapping claims and benefits already assigned elsewhere. Existing projects require evidence that any proposed credited component is genuinely additional. Additionality ruling: WaterSwap credits only water that would not exist, or would not remain in the environment, without the buyer’s support. Being new is not enough on its own; a new plant, scheme or works already approved and funded would occur anyway and is not additional. Every credited activity must pass five tests. (1) Defined activity: a specific activity and benefit period is assessed, never the whole output of a facility. (2) Conservative baseline: a credible without-support scenario is evidenced from metered records, budgets and operating plans, and the lower figure is used where doubt remains. (3) Not required or already paid for: anything required by law, licence, consent or contract, or already funded by tariffs, budgets, grants or supply contracts, is excluded. (4) Support makes the difference: open-book evidence must show the buyer’s contribution enables the activity to proceed, to be larger, or to occur earlier; only the enabled increment or the brought-forward period is credited. (5) Claimed once: the same benefit may not be claimed on another registry, sold to another party or counted in another party’s reported claim. Where several parties fund an activity, a buyer’s credited share is proportional to its contribution unless the other funders waive their claim in writing. Contributions that are repaid or earn a commercial return reduce or remove the credited share. Credits are measured in water, never in dollars contributed. A common-practice check applies: where most comparable facilities in the region already undertake the activity, it is treated as business as usual unless strong evidence shows otherwise. A buyer that uses the funded water itself is purchasing supply, not an offset; the same water cannot be both. Every decision records which tests were passed and why, and is re-tested at renewal; a benefit credited in one period cannot be credited again. Research performance alone never generates credits.

Public utilities and existing assets

Screening policy: public ownership, public co-funding or an existing asset is not an automatic exclusion. Assess a defined activity and benefit period, not the ownership category or the entire plant. New capacity, efficiency upgrades or continued operation may be considered only where evidence shows a positive change against a credible without-support scenario. Review committed budgets, grants, tariffs, supply contracts, operating obligations and other claims. Funding allocation alone does not prove additionality. Do not sell routine, already-funded or already-assigned outcomes again. Continued-operation (avoided-loss) claims carry a heightened burden of proof: require audited or independently reviewed financial statements and an open-book cash-flow forecast showing a shortfall that would cause shutdown or material output loss within a defined period, or a formal closure, decommissioning or service-reduction notice or resolution. Show that tariff, budget, insurance, warranty, grant and lender options have been considered. Routine or scheduled maintenance, maintenance the operator is already obliged or funded to perform, and cost overruns do not qualify. Credited quantities are limited to output that would otherwise be lost during the supported period, and support must be tied to the specific works or operation identified. Where compliance duties are involved, document the genuinely incremental component and seek targeted specialist advice on material unresolved questions; no automatic exemption applies. WaterSwap makes the eligibility decision and records its evidence and reasoning.

Desalination and data-centre partnerships

Desalination proposals may enter screening; this is not approval for credits. Define the benefit being claimed: improved water access, increased supply resilience or reduced freshwater pressure must not be conflated. Where freshwater displacement is claimed, demonstrate the reduction in abstraction or consumption, its location, timing, beneficiaries and durability; desalinated output alone is insufficient. A displacement claim also requires an enforceable mechanism, for the whole benefit period, that prevents the conserved freshwater being taken up by another user: for example a recorded forbearance or non-use agreement, a dedication or transfer to instream or environmental flow, a permanent or term reduction in a licence or allocation, or documented retention under an adjudicated-basin or groundwater-sustainability accounting framework, as applicable in the jurisdiction. The mechanism must be capable of independent verification. Without it, the benefit may be described only as supply resilience or improved access, not freshwater displacement. Assess intake impacts, brine and chemical discharges, energy and emissions, community access, permits and monitoring. Brine and other discharges must hold current permits from the relevant authorities (in California, for example, discharge permits and the State Water Resources Control Board’s Ocean Plan desalination requirements), supported by recent compliance monitoring; unresolved material non-compliance prevents eligibility. Report the energy source, energy intensity (kWh per m³) and associated emissions. Water benefits and emissions are not netted against each other: energy impacts are disclosed alongside the water claim, a project must not be described as low-emission or carbon-neutral unless separately evidenced, and buyers remain responsible for their own emissions accounting. A data centre buying its normal water supply does not automatically create a separate offset. Distinguish contractual or approval-related obligations from voluntary contributions, account for new demand and backup supplies, and document who may claim each benefit. Consider recycled water and demand reduction alongside desalination; choose the option supported by local evidence. Every credit carries a benefit label, such as improved water access, supply resilience or freshwater retained in a named catchment. Buyers may only make claims matching that label and location: a water-access benefit in one region cannot be presented as offsetting water use in another catchment. Desalination applications are decided by WaterSwap’s Head of Programme Integrity. Each applicant receives the decision and written reasons identifying the tests passed or failed, and the decision and reasons are archived unchanged. An applicant may appeal through the published grievance process.

Measurement and methodology

WaterSwap is responsible for adopting project-type-specific equations, data sources, counterfactual assumptions, uncertainty deductions, leakage, attribution and monitoring using documented scientific evidence. Publish the sources, units, applicability and limitations with each method. External approval of the entire rulebook is not required by this framework. Independent project verification must still assess whether the method is appropriate and the claimed calculation is supported. Where science is unresolved, defer the activity rather than invent a conversion factor. Estimated future benefits must be kept separate from measured benefits. Proposed issuance is ex-post only, after independent verification of the specified benefit period. No arbitrary conversion of restoration hectares or pollutant mass into water volume is permitted. Reference accounting method for volume benefits: WaterSwap adopts the World Resources Institute’s Volumetric Water Benefit Accounting 2.0 (VWBA 2.0, September 2025) as its reference method for quantifying volumetric water benefits. Applicants claiming a volume benefit must identify the VWBA 2.0 activity type, indicator and calculation used, and report the benefit in m³ for a named catchment and a stated benefit period. VWBA 2.0 governs how a volume is quantified only. It does not decide eligibility: every credited activity must still pass all five additionality tests, rights, consents and safeguard checks, and independent verification, and the conservative baseline and proportional-share rules apply to the quantified volume. Where VWBA 2.0 and these rules differ, the stricter requirement applies. VWBA benefits in different catchments or benefit periods are not added together, water-quality benefits are not converted into volume, and VWBA does not supply a universal conversion factor. A project-specific WaterSwap methodology must still be adopted before issuance. Use of VWBA 2.0 does not imply endorsement by WRI.

Verification and governance

Risk-based verification: every credited volume must be backed by an independent check before issuance, but that check need not always be a panel verifier engaged for WaterSwap. Route A (existing independent assurance): a panel verifier is not required only where all of the following apply: (1) the claimed volume comes from metered data that has already been independently checked, such as an Auditor-General or state audit office audit, metered returns audited by a water regulator under a licence, or audited annual reporting covering the specific metered volume; (2) WaterSwap can trace the claimed volume to that assured data for the same site and benefit period; and (3) no Route B trigger applies. Government or utility ownership does not qualify a project for Route A on its own; the existing assurance does. Route B (panel verifier required): the owner must commission a panel verifier, or a non-panel firm meeting every panel admission test, where any of the following applies: screening raises an alert, such as missing or unchecked evidence, inconsistent figures, or doubts about rights, consents or safeguards; no existing independent assurance covers the claimed volume; the claim relies on modelling or estimates rather than metered data; the claim is for continued operation (avoided loss); the claim is for desalination freshwater displacement; several funders share the activity and a proportional share must be calculated; the owner is a private entity with no audited reporting of the volume; or the project is selected for a random check. Random checks: WaterSwap may require a panel verifier for a random sample of Route A projects so that Route A cannot be used to avoid scrutiny; the sampling rate will be set and published before issuance opens. Existing assurance confirms a volume; it does not prove additionality, and all five additionality tests, rights, consents and safeguard checks apply to every project on either route. WaterSwap records which route was used and why, may move a project from Route A to Route B at any time before issuance if a trigger arises, and every future certificate will state its verification route. Under Route B, the project owner is responsible for commissioning and paying a competent independent verifier and providing the signed report, credential evidence and underlying data. Under Route A, the owner provides the assurance report and underlying metered data, and WaterSwap confirms the report with its issuer. WaterSwap must check report authenticity with the verifier, credential validity and relevant scope, independence, the methodology used and closure of material findings. A separate authorised decision-maker considers issuance. Payment by the owner must be disclosed; contingent fees and verification of a verifier’s own project work are not acceptable under this framework. There is no assumed universal water-credit verifier licence: applicable licensing, accreditation or scheme approval must be checked for the jurisdiction and method. Owner-provided certification does not automatically qualify a project or transfer WaterSwap’s responsibility for its issuance decision. Approved verifier panel: WaterSwap keeps a panel of independent verification firms so that every eligible project can obtain a qualified, unconflicted verifier. A firm is admitted only when WaterSwap has checked and recorded: (1) current accreditation to ISO 14065 or ISO/IEC 17029 (or a successor) from a national accreditation body that signs the IAF multilateral recognition arrangement, such as JAS-ANZ, ANAB or UKAS, with the certificate and scope schedule on file; (2) written confirmation of whether verification against these rules and WRI VWBA 2.0 falls within that accreditation and, if not, the basis on which assurance is given (for example ASAE 3000 or ISAE 3000), which is published next to the firm’s name; (3) a documented impartiality policy; (4) the countries where it can provide verifiers with relevant water or hydrology competence; (5) an indicative fee basis, so small and community projects can see likely costs early; and (6) a signed panel agreement. Panel membership is not exclusive; WaterSwap pays panel firms nothing for referrals and firms pay nothing to be listed. Membership is reviewed every year, and immediately if accreditation is suspended, withdrawn or narrowed. The project owner chooses a panel firm, contracts and pays it directly, and nominates it to WaterSwap; the nomination is confirmed only after the firm signs a project-specific conflict declaration. An owner may propose a firm outside the panel, but it must meet every admission test for that project; there is no easier route. If no unconflicted firm is available, the project waits; the rules are not relaxed. A firm may not verify a project if it or a related entity has, in the previous three years, designed, built, operated, advised on or prepared the application for the project; carried out laboratory testing, sampling, metering or engineering inspection whose results form part of the claimed benefit; developed the methodology applied; had a financial interest in the project, its owner or buyers of its credits; or been engaged by WaterSwap on any matter other than panel administration. Fees contingent on the quantity verified or on credits being issued are prohibited. A firm may verify at most five consecutive monitoring periods for the same project; a different firm must then verify at least one period before it may return. A panel firm’s report does not by itself qualify a project: for every report WaterSwap confirms authenticity directly with the firm, the signatory’s competence and the firm’s accreditation scope on the signing date, the conflict declaration and rotation rule, the methodology used and closure of all material findings, and records its own decision and reasons. Issuance remains a separate decision by an authorised decision-maker and stays disabled until WaterSwap opens it under updated rules. A firm that loses or narrows its accreditation, breaches the conflict rules, refuses authenticity checks or issues a materially wrong report may be suspended or removed; projects it verified are re-examined and credits withheld until resolved. WaterSwap publishes the panel list, each firm’s accreditation body and assurance basis, and admission and removal dates, but not fees agreed between owners and verifiers. No firm is named as a panel member until it has been admitted under these tests.

Australian, New Zealand and United States checks

Assess project-specific obligations using applicable official guidance and scientific evidence; obtain targeted advice when a material question remains unresolved. In Australia, assess relevant state/territory water rights, planning/environmental approvals and Aboriginal and Torres Strait Islander interests. In New Zealand, assess applicable resource consents, water rights and Māori, iwi and hapū rights and interests. In the United States, water law differs by state: assess the applicable state water rights and permits (for example, State Water Resources Control Board requirements in California), federal and state discharge and environmental permits including those covering desalination intake and brine, and Tribal water rights and interests. This framework does not determine consent requirements or substitute for required engagement, permits or project-specific legal advice.

Safeguards and grievances

Evaluate downstream effects, biodiversity, water access, displacement and impacts on communities before acceptance. Record consultation and unresolved concerns. Complaints may be submitted through the contact form with the project reference. WaterSwap management is accountable for receiving and assigning complaints. Record the issue, evidence, conflicts, decision and reasons; an appeal must be considered by someone not involved in the original decision. Before sales begin, publish the responsible roles and response timetable and arrange independent escalation where an unconflicted reviewer is unavailable. No response deadline is currently promised.

Registry and issuance controls

The intended live registry must link every serialised unit to a project, methodology/version, geography, benefit period, verified quantity and supporting report. It must prevent over-issuance, duplicate period allocation and double retirement, with transactional reconciliation and an audit history. The current platform stores screening records and private draft certificates only; live issuance, transfers and retirement are not implemented or enabled.

Certificates and permitted claims

A future claim certificate should identify the beneficiary and specific retired units, with a public status record and carefully qualified claim wording. Retirement—not a pledge or a printable document—would be the basis for an exclusive benefit claim. Do not claim carbon neutrality, water neutrality, water positivity, regulatory compliance or a water entitlement merely by holding a certificate. Even verified volume is not proof of equivalence to a buyer’s footprint.

Benefit periods and renewal

Record the actual start and end dates of the benefit period separately from the certificate issue date. A 12-month reporting cycle may be adopted after review, but it must not recycle an already claimed benefit. Renewal, if offered, requires newly eligible and verified benefits and new retirement records. No automatic renewals or payments are enabled; term and commercial policy remain to be decided.

Corrections, reversals and continuity

When credible evidence challenges a benefit, pause the affected application or, once transactions exist, the affected unsold inventory and issuance while investigating. Preserve the original evidence, record the findings and correction, notify affected parties, and disclose material registry status changes without exposing private data. Replacement or refund obligations must be established in sale terms before any purchase; this framework does not invent an unconditional guarantee or waive statutory rights. Set any uncertainty or reversal buffer from evidence, not by copying another programme. Preserve original records and append corrections; never silently rewrite issued certificates. Finalise operational cancellation, notification, backup and registry continuity procedures before sales.

Version control and next steps

WS-1.6 adopts risk-based verification. A panel verifier is not required where the claimed volume comes from metered data already independently assured (for example by an Auditor-General audit, regulator-audited metered returns or audited annual reporting), WaterSwap can trace the claim to that data, and no Route B trigger applies. A panel verifier remains required where screening raises an alert, assurance is absent, volumes are modelled or estimated, or the claim involves continued operation, desalination displacement, shared funding, a private owner without audited reporting, or selection for a random check. This replaces the WS-1.5 requirement that every project commission a verifier; every credited volume still needs an independent check before issuance, and all other rules are unchanged. WS-1.6 retains in full WS-1.5, which adopted the approved verifier panel (admission tests, owner choice and direct payment, project-specific conflict declarations, a three-year conflict lookback, rotation after five consecutive periods, WaterSwap checks on every report and removal rules), WS-1.4, which adopted WRI Volumetric Water Benefit Accounting 2.0 as the reference method for quantifying volume benefits only, and the WS-1.3 additionality ruling (five tests for every credited activity, proportional crediting where funding is shared, a common-practice check, benefit labels limiting claims to the benefit type and location, and written, archived reasons for desalination decisions) and the WS-1.2 requirements for public utilities, continued-operation claims and desalination. Approved by WaterSwap management 23 November 2026; applies to new submissions using this version when published. WS-1.5, WS-1.4, WS-1.3, WS-1.2, WS-1.1, WS-1.0 and earlier drafts are preserved unchanged in the archive. No effective issuance date has been set. WaterSwap management approves revisions with documented evidence, reasons, effective scope and transition arrangements. Publish a version number, effective date and change summary and preserve the previous rules before a revision takes effect. Earlier applications retain their recorded version unless amended and resubmitted; migration requires a recorded explanation and notice. Future issued batches must retain their original rule and methodology versions. Later changes must not silently rewrite purchases or extinguish rights; corrections follow the published correction process. Public feedback informs decisions but does not give any contributor a veto. Whole-rulebook external approval is not a condition of revision; independent project verification and applicable legal requirements remain mandatory.

WS-1.6 launch requirements

  1. Confirm the issuing legal entity, governance, insurance and contractual responsibilities in Australia, New Zealand and the United States.
  2. WaterSwap must adopt and publish a versioned, evidence-based methodology for each eligible benefit type and jurisdiction, with equations, source references, assumptions and limitations. Exclude activities where a defensible method is not established.
  3. Admit at least one independent verification firm to the approved verifier panel under the WS-1.5 admission tests, set and publish the WS-1.6 random-check sampling rate for Route A projects, and appoint an issuance decision-maker separated from project development and sales.
  4. Document applicable requirements for claims, permits, benefit ownership, consumer rights, taxation and any financial-services implications. Resolve material legal uncertainties through targeted advice where needed; whole-rulebook external approval is not a WaterSwap prerequisite.
  5. Validate a real pilot with monitoring data, additionality, safeguards, independent verification and closed findings.
  6. Implement and independently test live serial allocation, quantity reconciliation, transfers, irreversible retirement, corrections and reversal handling before enabling issuance.
  7. Approve buyer contracts, permitted claims, complaints/appeals arrangements, fees and a continuity plan for registry records.
WS-1.5 · Approved verifier panel (archived)

Adopted . Superseded by WS-1.6 for new submissions using that version. Its panel admission, conflict, rotation and removal rules are carried forward unchanged into WS-1.6; WS-1.6 replaces only its requirement that every project commission a verifier. Preserved unchanged below.

Scope and status

WaterSwap aims to build an internationally credible voluntary water-benefit programme, starting in Australia, New Zealand and the United States. International partnership and buyer enquiries are welcome; project applications currently cover Australia, New Zealand and the United States only. Expansion requires jurisdiction-specific scientific and legal review, approved methodologies and local safeguards. WaterSwap owns and adopts this voluntary governance and application-screening framework. It is not a government-authorised regulatory or offset scheme; it does not override applicable laws, permits or third-party rights. Adoption of this framework is not approval of a credit calculation methodology. Project registration, an enquiry, a pledge or a draft certificate does not create a water credit. No affiliation, accreditation or endorsement by ISO, WRI or another standard owner is claimed.

Buyer briefs and project matching

WaterSwap works on behalf of large water users, such as data centres, to find suitable projects, in the way a recruitment agency works for an employer. A buyer may submit a brief describing its sites, catchments, reporting frameworks and additional criteria. Project owners carry the onus of demonstrating, with evidence, that their project meets the WaterSwap minimum and a brief. WaterSwap may present matching projects to a buyer as a shortlist. Buyer criteria may add requirements or narrow a portfolio; they never lower the WaterSwap minimum. Buyers choose which eligible projects to support, but do not decide eligibility, verified quantities or programme rules. WaterSwap’s commercial relationship with buyers must not influence eligibility decisions. A match, shortlist or expression of interest is not credit issuance or a purchase commitment. Research performance alone never generates credits.

Accountability and conflicts of interest

WaterSwap management owns the programme, approves its rules and is accountable for their application. WaterSwap has a commercial interest in future credit sales; that interest must not determine eligibility or verified quantities. Record financial, ownership and advisory conflicts for each decision. Anyone with a project-specific conflict must withdraw from the decision. Before issuance begins, name an authorised decision-maker separated from project development and sales and record their approval reasons. Where no unconflicted decision-maker is available, pause the decision and arrange independent escalation. Independent project verification is separate from WaterSwap rule ownership; no external governance board or accreditation is claimed.

Evidence, assumptions and limitations

Use published scientific guidance and official regulatory guidance as evidence, not as endorsement or a substitute for project-specific advice. Record source titles, versions or publication dates, the provisions used, local applicability and departures in each methodology. Legal commentary is not advice specifically given to WaterSwap. General reference guidance below does not yet establish a complete credit methodology. No universal conversion factor, credit denomination or desalination eligibility formula is settled. Update evidence openly as knowledge develops; unresolved material uncertainty prevents issuance for the affected activity.

Units and local relevance

Water-volume benefits and water-quality improvements are different products. Volumetric calculations should report m³; pollutant reductions should report the identified pollutant and mass. There is no approved WaterSwap credit denomination or conversion factor yet. Do not treat water from different catchments, time periods or benefit types as interchangeable. Volume alone does not establish a broader ecological outcome.

Eligibility and additionality

Require documented rights to deliver and assign the benefit, valid local consents, a mapped boundary, a conservative baseline, additionality, funding attribution and no duplicate claims. Disclose public funding and legally required activities. Reject unsupported ownership, overlapping claims and benefits already assigned elsewhere. Existing projects require evidence that any proposed credited component is genuinely additional. Additionality ruling: WaterSwap credits only water that would not exist, or would not remain in the environment, without the buyer’s support. Being new is not enough on its own; a new plant, scheme or works already approved and funded would occur anyway and is not additional. Every credited activity must pass five tests. (1) Defined activity: a specific activity and benefit period is assessed, never the whole output of a facility. (2) Conservative baseline: a credible without-support scenario is evidenced from metered records, budgets and operating plans, and the lower figure is used where doubt remains. (3) Not required or already paid for: anything required by law, licence, consent or contract, or already funded by tariffs, budgets, grants or supply contracts, is excluded. (4) Support makes the difference: open-book evidence must show the buyer’s contribution enables the activity to proceed, to be larger, or to occur earlier; only the enabled increment or the brought-forward period is credited. (5) Claimed once: the same benefit may not be claimed on another registry, sold to another party or counted in another party’s reported claim. Where several parties fund an activity, a buyer’s credited share is proportional to its contribution unless the other funders waive their claim in writing. Contributions that are repaid or earn a commercial return reduce or remove the credited share. Credits are measured in water, never in dollars contributed. A common-practice check applies: where most comparable facilities in the region already undertake the activity, it is treated as business as usual unless strong evidence shows otherwise. A buyer that uses the funded water itself is purchasing supply, not an offset; the same water cannot be both. Every decision records which tests were passed and why, and is re-tested at renewal; a benefit credited in one period cannot be credited again. Research performance alone never generates credits.

Public utilities and existing assets

Screening policy: public ownership, public co-funding or an existing asset is not an automatic exclusion. Assess a defined activity and benefit period, not the ownership category or the entire plant. New capacity, efficiency upgrades or continued operation may be considered only where evidence shows a positive change against a credible without-support scenario. Review committed budgets, grants, tariffs, supply contracts, operating obligations and other claims. Funding allocation alone does not prove additionality. Do not sell routine, already-funded or already-assigned outcomes again. Continued-operation (avoided-loss) claims carry a heightened burden of proof: require audited or independently reviewed financial statements and an open-book cash-flow forecast showing a shortfall that would cause shutdown or material output loss within a defined period, or a formal closure, decommissioning or service-reduction notice or resolution. Show that tariff, budget, insurance, warranty, grant and lender options have been considered. Routine or scheduled maintenance, maintenance the operator is already obliged or funded to perform, and cost overruns do not qualify. Credited quantities are limited to output that would otherwise be lost during the supported period, and support must be tied to the specific works or operation identified. Where compliance duties are involved, document the genuinely incremental component and seek targeted specialist advice on material unresolved questions; no automatic exemption applies. WaterSwap makes the eligibility decision and records its evidence and reasoning.

Desalination and data-centre partnerships

Desalination proposals may enter screening; this is not approval for credits. Define the benefit being claimed: improved water access, increased supply resilience or reduced freshwater pressure must not be conflated. Where freshwater displacement is claimed, demonstrate the reduction in abstraction or consumption, its location, timing, beneficiaries and durability; desalinated output alone is insufficient. A displacement claim also requires an enforceable mechanism, for the whole benefit period, that prevents the conserved freshwater being taken up by another user: for example a recorded forbearance or non-use agreement, a dedication or transfer to instream or environmental flow, a permanent or term reduction in a licence or allocation, or documented retention under an adjudicated-basin or groundwater-sustainability accounting framework, as applicable in the jurisdiction. The mechanism must be capable of independent verification. Without it, the benefit may be described only as supply resilience or improved access, not freshwater displacement. Assess intake impacts, brine and chemical discharges, energy and emissions, community access, permits and monitoring. Brine and other discharges must hold current permits from the relevant authorities (in California, for example, discharge permits and the State Water Resources Control Board’s Ocean Plan desalination requirements), supported by recent compliance monitoring; unresolved material non-compliance prevents eligibility. Report the energy source, energy intensity (kWh per m³) and associated emissions. Water benefits and emissions are not netted against each other: energy impacts are disclosed alongside the water claim, a project must not be described as low-emission or carbon-neutral unless separately evidenced, and buyers remain responsible for their own emissions accounting. A data centre buying its normal water supply does not automatically create a separate offset. Distinguish contractual or approval-related obligations from voluntary contributions, account for new demand and backup supplies, and document who may claim each benefit. Consider recycled water and demand reduction alongside desalination; choose the option supported by local evidence. Every credit carries a benefit label, such as improved water access, supply resilience or freshwater retained in a named catchment. Buyers may only make claims matching that label and location: a water-access benefit in one region cannot be presented as offsetting water use in another catchment. Desalination applications are decided by WaterSwap’s Head of Programme Integrity. Each applicant receives the decision and written reasons identifying the tests passed or failed, and the decision and reasons are archived unchanged. An applicant may appeal through the published grievance process.

Measurement and methodology

WaterSwap is responsible for adopting project-type-specific equations, data sources, counterfactual assumptions, uncertainty deductions, leakage, attribution and monitoring using documented scientific evidence. Publish the sources, units, applicability and limitations with each method. External approval of the entire rulebook is not required by this framework. Independent project verification must still assess whether the method is appropriate and the claimed calculation is supported. Where science is unresolved, defer the activity rather than invent a conversion factor. Estimated future benefits must be kept separate from measured benefits. Proposed issuance is ex-post only, after independent verification of the specified benefit period. No arbitrary conversion of restoration hectares or pollutant mass into water volume is permitted. Reference accounting method for volume benefits: WaterSwap adopts the World Resources Institute’s Volumetric Water Benefit Accounting 2.0 (VWBA 2.0, September 2025) as its reference method for quantifying volumetric water benefits. Applicants claiming a volume benefit must identify the VWBA 2.0 activity type, indicator and calculation used, and report the benefit in m³ for a named catchment and a stated benefit period. VWBA 2.0 governs how a volume is quantified only. It does not decide eligibility: every credited activity must still pass all five additionality tests, rights, consents and safeguard checks, and independent verification, and the conservative baseline and proportional-share rules apply to the quantified volume. Where VWBA 2.0 and these rules differ, the stricter requirement applies. VWBA benefits in different catchments or benefit periods are not added together, water-quality benefits are not converted into volume, and VWBA does not supply a universal conversion factor. A project-specific WaterSwap methodology must still be adopted before issuance. Use of VWBA 2.0 does not imply endorsement by WRI.

Verification and governance

The project owner is responsible for commissioning and paying a competent independent verifier and providing the signed report, credential evidence and underlying data. WaterSwap must check report authenticity with the verifier, credential validity and relevant scope, independence, the methodology used and closure of material findings. A separate authorised decision-maker considers issuance. Payment by the owner must be disclosed; contingent fees and verification of a verifier’s own project work are not acceptable under this framework. There is no assumed universal water-credit verifier licence: applicable licensing, accreditation or scheme approval must be checked for the jurisdiction and method. Owner-provided certification does not automatically qualify a project or transfer WaterSwap’s responsibility for its issuance decision. Approved verifier panel: WaterSwap keeps a panel of independent verification firms so that every eligible project can obtain a qualified, unconflicted verifier. A firm is admitted only when WaterSwap has checked and recorded: (1) current accreditation to ISO 14065 or ISO/IEC 17029 (or a successor) from a national accreditation body that signs the IAF multilateral recognition arrangement, such as JAS-ANZ, ANAB or UKAS, with the certificate and scope schedule on file; (2) written confirmation of whether verification against these rules and WRI VWBA 2.0 falls within that accreditation and, if not, the basis on which assurance is given (for example ASAE 3000 or ISAE 3000), which is published next to the firm’s name; (3) a documented impartiality policy; (4) the countries where it can provide verifiers with relevant water or hydrology competence; (5) an indicative fee basis, so small and community projects can see likely costs early; and (6) a signed panel agreement. Panel membership is not exclusive; WaterSwap pays panel firms nothing for referrals and firms pay nothing to be listed. Membership is reviewed every year, and immediately if accreditation is suspended, withdrawn or narrowed. The project owner chooses a panel firm, contracts and pays it directly, and nominates it to WaterSwap; the nomination is confirmed only after the firm signs a project-specific conflict declaration. An owner may propose a firm outside the panel, but it must meet every admission test for that project; there is no easier route. If no unconflicted firm is available, the project waits; the rules are not relaxed. A firm may not verify a project if it or a related entity has, in the previous three years, designed, built, operated, advised on or prepared the application for the project; carried out laboratory testing, sampling, metering or engineering inspection whose results form part of the claimed benefit; developed the methodology applied; had a financial interest in the project, its owner or buyers of its credits; or been engaged by WaterSwap on any matter other than panel administration. Fees contingent on the quantity verified or on credits being issued are prohibited. A firm may verify at most five consecutive monitoring periods for the same project; a different firm must then verify at least one period before it may return. A panel firm’s report does not by itself qualify a project: for every report WaterSwap confirms authenticity directly with the firm, the signatory’s competence and the firm’s accreditation scope on the signing date, the conflict declaration and rotation rule, the methodology used and closure of all material findings, and records its own decision and reasons. Issuance remains a separate decision by an authorised decision-maker and stays disabled until WaterSwap opens it under updated rules. A firm that loses or narrows its accreditation, breaches the conflict rules, refuses authenticity checks or issues a materially wrong report may be suspended or removed; projects it verified are re-examined and credits withheld until resolved. WaterSwap publishes the panel list, each firm’s accreditation body and assurance basis, and admission and removal dates, but not fees agreed between owners and verifiers. No firm is named as a panel member until it has been admitted under these tests.

Australian, New Zealand and United States checks

Assess project-specific obligations using applicable official guidance and scientific evidence; obtain targeted advice when a material question remains unresolved. In Australia, assess relevant state/territory water rights, planning/environmental approvals and Aboriginal and Torres Strait Islander interests. In New Zealand, assess applicable resource consents, water rights and Māori, iwi and hapū rights and interests. In the United States, water law differs by state: assess the applicable state water rights and permits (for example, State Water Resources Control Board requirements in California), federal and state discharge and environmental permits including those covering desalination intake and brine, and Tribal water rights and interests. This framework does not determine consent requirements or substitute for required engagement, permits or project-specific legal advice.

Safeguards and grievances

Evaluate downstream effects, biodiversity, water access, displacement and impacts on communities before acceptance. Record consultation and unresolved concerns. Complaints may be submitted through the contact form with the project reference. WaterSwap management is accountable for receiving and assigning complaints. Record the issue, evidence, conflicts, decision and reasons; an appeal must be considered by someone not involved in the original decision. Before sales begin, publish the responsible roles and response timetable and arrange independent escalation where an unconflicted reviewer is unavailable. No response deadline is currently promised.

Registry and issuance controls

The intended live registry must link every serialised unit to a project, methodology/version, geography, benefit period, verified quantity and supporting report. It must prevent over-issuance, duplicate period allocation and double retirement, with transactional reconciliation and an audit history. The current platform stores screening records and private draft certificates only; live issuance, transfers and retirement are not implemented or enabled.

Certificates and permitted claims

A future claim certificate should identify the beneficiary and specific retired units, with a public status record and carefully qualified claim wording. Retirement—not a pledge or a printable document—would be the basis for an exclusive benefit claim. Do not claim carbon neutrality, water neutrality, water positivity, regulatory compliance or a water entitlement merely by holding a certificate. Even verified volume is not proof of equivalence to a buyer’s footprint.

Benefit periods and renewal

Record the actual start and end dates of the benefit period separately from the certificate issue date. A 12-month reporting cycle may be adopted after review, but it must not recycle an already claimed benefit. Renewal, if offered, requires newly eligible and verified benefits and new retirement records. No automatic renewals or payments are enabled; term and commercial policy remain to be decided.

Corrections, reversals and continuity

When credible evidence challenges a benefit, pause the affected application or, once transactions exist, the affected unsold inventory and issuance while investigating. Preserve the original evidence, record the findings and correction, notify affected parties, and disclose material registry status changes without exposing private data. Replacement or refund obligations must be established in sale terms before any purchase; this framework does not invent an unconditional guarantee or waive statutory rights. Set any uncertainty or reversal buffer from evidence, not by copying another programme. Preserve original records and append corrections; never silently rewrite issued certificates. Finalise operational cancellation, notification, backup and registry continuity procedures before sales.

Version control and next steps

WS-1.5 adopts an approved verifier panel: admission tests for independent verification firms, owner choice and direct payment, project-specific conflict declarations, a three-year conflict lookback, rotation after five consecutive periods, WaterSwap checks on every report, and removal rules. It adds requirements and does not lower any earlier rule. WS-1.5 retains in full WS-1.4, which adopted WRI Volumetric Water Benefit Accounting 2.0 as the reference method for quantifying volume benefits only, and the WS-1.3 additionality ruling (five tests for every credited activity, proportional crediting where funding is shared, a common-practice check, benefit labels limiting claims to the benefit type and location, and written, archived reasons for desalination decisions) and the WS-1.2 requirements for public utilities, continued-operation claims and desalination. Approved by WaterSwap management 23 November 2026; applies to new submissions using this version when published. WS-1.4, WS-1.3, WS-1.2, WS-1.1, WS-1.0 and earlier drafts are preserved unchanged in the archive. No effective issuance date has been set. WaterSwap management approves revisions with documented evidence, reasons, effective scope and transition arrangements. Publish a version number, effective date and change summary and preserve the previous rules before a revision takes effect. Earlier applications retain their recorded version unless amended and resubmitted; migration requires a recorded explanation and notice. Future issued batches must retain their original rule and methodology versions. Later changes must not silently rewrite purchases or extinguish rights; corrections follow the published correction process. Public feedback informs decisions but does not give any contributor a veto. Whole-rulebook external approval is not a condition of revision; independent project verification and applicable legal requirements remain mandatory.

WS-1.5 launch requirements

  1. Confirm the issuing legal entity, governance, insurance and contractual responsibilities in Australia, New Zealand and the United States.
  2. WaterSwap must adopt and publish a versioned, evidence-based methodology for each eligible benefit type and jurisdiction, with equations, source references, assumptions and limitations. Exclude activities where a defensible method is not established.
  3. Admit at least one independent verification firm to the approved verifier panel under the WS-1.5 admission tests, and appoint an issuance decision-maker separated from project development and sales.
  4. Document applicable requirements for claims, permits, benefit ownership, consumer rights, taxation and any financial-services implications. Resolve material legal uncertainties through targeted advice where needed; whole-rulebook external approval is not a WaterSwap prerequisite.
  5. Validate a real pilot with monitoring data, additionality, safeguards, independent verification and closed findings.
  6. Implement and independently test live serial allocation, quantity reconciliation, transfers, irreversible retirement, corrections and reversal handling before enabling issuance.
  7. Approve buyer contracts, permitted claims, complaints/appeals arrangements, fees and a continuity plan for registry records.
WS-1.4 · Reference method for volume benefits (archived)

Adopted . Superseded by WS-1.5 for new submissions using that version. Its VWBA 2.0 reference method is carried forward unchanged into WS-1.5. Preserved unchanged below.

WaterSwap adopts WRI Volumetric Water Benefit Accounting 2.0 (September 2025) as its reference method for quantifying volume benefits. Applicants claiming a volume benefit must name the method’s activity type, indicator and calculation, and report m³ for a named catchment and benefit period. It governs how a volume is measured, not whether it counts: all five additionality tests, independent verification and every WS-1.3 rule still apply, and the stricter rule applies where the two differ. Volumes from different catchments or periods are never added together, and water quality is never converted into volume.

Scope and status

WaterSwap aims to build an internationally credible voluntary water-benefit programme, starting in Australia, New Zealand and the United States. International partnership and buyer enquiries are welcome; project applications currently cover Australia, New Zealand and the United States only. Expansion requires jurisdiction-specific scientific and legal review, approved methodologies and local safeguards. WaterSwap owns and adopts this voluntary governance and application-screening framework. It is not a government-authorised regulatory or offset scheme; it does not override applicable laws, permits or third-party rights. Adoption of this framework is not approval of a credit calculation methodology. Project registration, an enquiry, a pledge or a draft certificate does not create a water credit. No affiliation, accreditation or endorsement by ISO, WRI or another standard owner is claimed.

Buyer briefs and project matching

WaterSwap works on behalf of large water users, such as data centres, to find suitable projects, in the way a recruitment agency works for an employer. A buyer may submit a brief describing its sites, catchments, reporting frameworks and additional criteria. Project owners carry the onus of demonstrating, with evidence, that their project meets the WaterSwap minimum and a brief. WaterSwap may present matching projects to a buyer as a shortlist. Buyer criteria may add requirements or narrow a portfolio; they never lower the WaterSwap minimum. Buyers choose which eligible projects to support, but do not decide eligibility, verified quantities or programme rules. WaterSwap’s commercial relationship with buyers must not influence eligibility decisions. A match, shortlist or expression of interest is not credit issuance or a purchase commitment. Research performance alone never generates credits.

Accountability and conflicts of interest

WaterSwap management owns the programme, approves its rules and is accountable for their application. WaterSwap has a commercial interest in future credit sales; that interest must not determine eligibility or verified quantities. Record financial, ownership and advisory conflicts for each decision. Anyone with a project-specific conflict must withdraw from the decision. Before issuance begins, name an authorised decision-maker separated from project development and sales and record their approval reasons. Where no unconflicted decision-maker is available, pause the decision and arrange independent escalation. Independent project verification is separate from WaterSwap rule ownership; no external governance board or accreditation is claimed.

Evidence, assumptions and limitations

Use published scientific guidance and official regulatory guidance as evidence, not as endorsement or a substitute for project-specific advice. Record source titles, versions or publication dates, the provisions used, local applicability and departures in each methodology. Legal commentary is not advice specifically given to WaterSwap. General reference guidance below does not yet establish a complete credit methodology. No universal conversion factor, credit denomination or desalination eligibility formula is settled. Update evidence openly as knowledge develops; unresolved material uncertainty prevents issuance for the affected activity.

Units and local relevance

Water-volume benefits and water-quality improvements are different products. Volumetric calculations should report m³; pollutant reductions should report the identified pollutant and mass. There is no approved WaterSwap credit denomination or conversion factor yet. Do not treat water from different catchments, time periods or benefit types as interchangeable. Volume alone does not establish a broader ecological outcome.

Eligibility and additionality

Require documented rights to deliver and assign the benefit, valid local consents, a mapped boundary, a conservative baseline, additionality, funding attribution and no duplicate claims. Disclose public funding and legally required activities. Reject unsupported ownership, overlapping claims and benefits already assigned elsewhere. Existing projects require evidence that any proposed credited component is genuinely additional. Additionality ruling: WaterSwap credits only water that would not exist, or would not remain in the environment, without the buyer’s support. Being new is not enough on its own; a new plant, scheme or works already approved and funded would occur anyway and is not additional. Every credited activity must pass five tests. (1) Defined activity: a specific activity and benefit period is assessed, never the whole output of a facility. (2) Conservative baseline: a credible without-support scenario is evidenced from metered records, budgets and operating plans, and the lower figure is used where doubt remains. (3) Not required or already paid for: anything required by law, licence, consent or contract, or already funded by tariffs, budgets, grants or supply contracts, is excluded. (4) Support makes the difference: open-book evidence must show the buyer’s contribution enables the activity to proceed, to be larger, or to occur earlier; only the enabled increment or the brought-forward period is credited. (5) Claimed once: the same benefit may not be claimed on another registry, sold to another party or counted in another party’s reported claim. Where several parties fund an activity, a buyer’s credited share is proportional to its contribution unless the other funders waive their claim in writing. Contributions that are repaid or earn a commercial return reduce or remove the credited share. Credits are measured in water, never in dollars contributed. A common-practice check applies: where most comparable facilities in the region already undertake the activity, it is treated as business as usual unless strong evidence shows otherwise. A buyer that uses the funded water itself is purchasing supply, not an offset; the same water cannot be both. Every decision records which tests were passed and why, and is re-tested at renewal; a benefit credited in one period cannot be credited again. Research performance alone never generates credits.

Public utilities and existing assets

Screening policy: public ownership, public co-funding or an existing asset is not an automatic exclusion. Assess a defined activity and benefit period, not the ownership category or the entire plant. New capacity, efficiency upgrades or continued operation may be considered only where evidence shows a positive change against a credible without-support scenario. Review committed budgets, grants, tariffs, supply contracts, operating obligations and other claims. Funding allocation alone does not prove additionality. Do not sell routine, already-funded or already-assigned outcomes again. Continued-operation (avoided-loss) claims carry a heightened burden of proof: require audited or independently reviewed financial statements and an open-book cash-flow forecast showing a shortfall that would cause shutdown or material output loss within a defined period, or a formal closure, decommissioning or service-reduction notice or resolution. Show that tariff, budget, insurance, warranty, grant and lender options have been considered. Routine or scheduled maintenance, maintenance the operator is already obliged or funded to perform, and cost overruns do not qualify. Credited quantities are limited to output that would otherwise be lost during the supported period, and support must be tied to the specific works or operation identified. Where compliance duties are involved, document the genuinely incremental component and seek targeted specialist advice on material unresolved questions; no automatic exemption applies. WaterSwap makes the eligibility decision and records its evidence and reasoning.

Desalination and data-centre partnerships

Desalination proposals may enter screening; this is not approval for credits. Define the benefit being claimed: improved water access, increased supply resilience or reduced freshwater pressure must not be conflated. Where freshwater displacement is claimed, demonstrate the reduction in abstraction or consumption, its location, timing, beneficiaries and durability; desalinated output alone is insufficient. A displacement claim also requires an enforceable mechanism, for the whole benefit period, that prevents the conserved freshwater being taken up by another user: for example a recorded forbearance or non-use agreement, a dedication or transfer to instream or environmental flow, a permanent or term reduction in a licence or allocation, or documented retention under an adjudicated-basin or groundwater-sustainability accounting framework, as applicable in the jurisdiction. The mechanism must be capable of independent verification. Without it, the benefit may be described only as supply resilience or improved access, not freshwater displacement. Assess intake impacts, brine and chemical discharges, energy and emissions, community access, permits and monitoring. Brine and other discharges must hold current permits from the relevant authorities (in California, for example, discharge permits and the State Water Resources Control Board’s Ocean Plan desalination requirements), supported by recent compliance monitoring; unresolved material non-compliance prevents eligibility. Report the energy source, energy intensity (kWh per m³) and associated emissions. Water benefits and emissions are not netted against each other: energy impacts are disclosed alongside the water claim, a project must not be described as low-emission or carbon-neutral unless separately evidenced, and buyers remain responsible for their own emissions accounting. A data centre buying its normal water supply does not automatically create a separate offset. Distinguish contractual or approval-related obligations from voluntary contributions, account for new demand and backup supplies, and document who may claim each benefit. Consider recycled water and demand reduction alongside desalination; choose the option supported by local evidence. Every credit carries a benefit label, such as improved water access, supply resilience or freshwater retained in a named catchment. Buyers may only make claims matching that label and location: a water-access benefit in one region cannot be presented as offsetting water use in another catchment. Desalination applications are decided by WaterSwap’s Head of Programme Integrity. Each applicant receives the decision and written reasons identifying the tests passed or failed, and the decision and reasons are archived unchanged. An applicant may appeal through the published grievance process.

Measurement and methodology

WaterSwap is responsible for adopting project-type-specific equations, data sources, counterfactual assumptions, uncertainty deductions, leakage, attribution and monitoring using documented scientific evidence. Publish the sources, units, applicability and limitations with each method. External approval of the entire rulebook is not required by this framework. Independent project verification must still assess whether the method is appropriate and the claimed calculation is supported. Where science is unresolved, defer the activity rather than invent a conversion factor. Estimated future benefits must be kept separate from measured benefits. Proposed issuance is ex-post only, after independent verification of the specified benefit period. No arbitrary conversion of restoration hectares or pollutant mass into water volume is permitted. Reference accounting method for volume benefits: WaterSwap adopts the World Resources Institute’s Volumetric Water Benefit Accounting 2.0 (VWBA 2.0, September 2025) as its reference method for quantifying volumetric water benefits. Applicants claiming a volume benefit must identify the VWBA 2.0 activity type, indicator and calculation used, and report the benefit in m³ for a named catchment and a stated benefit period. VWBA 2.0 governs how a volume is quantified only. It does not decide eligibility: every credited activity must still pass all five additionality tests, rights, consents and safeguard checks, and independent verification, and the conservative baseline and proportional-share rules apply to the quantified volume. Where VWBA 2.0 and these rules differ, the stricter requirement applies. VWBA benefits in different catchments or benefit periods are not added together, water-quality benefits are not converted into volume, and VWBA does not supply a universal conversion factor. A project-specific WaterSwap methodology must still be adopted before issuance. Use of VWBA 2.0 does not imply endorsement by WRI.

Verification and governance

The project owner is responsible for commissioning and paying a competent independent verifier and providing the signed report, credential evidence and underlying data. WaterSwap must check report authenticity with the verifier, credential validity and relevant scope, independence, the methodology used and closure of material findings. A separate authorised decision-maker considers issuance. Payment by the owner must be disclosed; contingent fees and verification of a verifier’s own project work are not acceptable under this framework. There is no assumed universal water-credit verifier licence: applicable licensing, accreditation or scheme approval must be checked for the jurisdiction and method. Owner-provided certification does not automatically qualify a project or transfer WaterSwap’s responsibility for its issuance decision.

Australian, New Zealand and United States checks

Assess project-specific obligations using applicable official guidance and scientific evidence; obtain targeted advice when a material question remains unresolved. In Australia, assess relevant state/territory water rights, planning/environmental approvals and Aboriginal and Torres Strait Islander interests. In New Zealand, assess applicable resource consents, water rights and Māori, iwi and hapū rights and interests. In the United States, water law differs by state: assess the applicable state water rights and permits (for example, State Water Resources Control Board requirements in California), federal and state discharge and environmental permits including those covering desalination intake and brine, and Tribal water rights and interests. This framework does not determine consent requirements or substitute for required engagement, permits or project-specific legal advice.

Safeguards and grievances

Evaluate downstream effects, biodiversity, water access, displacement and impacts on communities before acceptance. Record consultation and unresolved concerns. Complaints may be submitted through the contact form with the project reference. WaterSwap management is accountable for receiving and assigning complaints. Record the issue, evidence, conflicts, decision and reasons; an appeal must be considered by someone not involved in the original decision. Before sales begin, publish the responsible roles and response timetable and arrange independent escalation where an unconflicted reviewer is unavailable. No response deadline is currently promised.

Registry and issuance controls

The intended live registry must link every serialised unit to a project, methodology/version, geography, benefit period, verified quantity and supporting report. It must prevent over-issuance, duplicate period allocation and double retirement, with transactional reconciliation and an audit history. The current platform stores screening records and private draft certificates only; live issuance, transfers and retirement are not implemented or enabled.

Certificates and permitted claims

A future claim certificate should identify the beneficiary and specific retired units, with a public status record and carefully qualified claim wording. Retirement—not a pledge or a printable document—would be the basis for an exclusive benefit claim. Do not claim carbon neutrality, water neutrality, water positivity, regulatory compliance or a water entitlement merely by holding a certificate. Even verified volume is not proof of equivalence to a buyer’s footprint.

Benefit periods and renewal

Record the actual start and end dates of the benefit period separately from the certificate issue date. A 12-month reporting cycle may be adopted after review, but it must not recycle an already claimed benefit. Renewal, if offered, requires newly eligible and verified benefits and new retirement records. No automatic renewals or payments are enabled; term and commercial policy remain to be decided.

Corrections, reversals and continuity

When credible evidence challenges a benefit, pause the affected application or, once transactions exist, the affected unsold inventory and issuance while investigating. Preserve the original evidence, record the findings and correction, notify affected parties, and disclose material registry status changes without exposing private data. Replacement or refund obligations must be established in sale terms before any purchase; this framework does not invent an unconditional guarantee or waive statutory rights. Set any uncertainty or reversal buffer from evidence, not by copying another programme. Preserve original records and append corrections; never silently rewrite issued certificates. Finalise operational cancellation, notification, backup and registry continuity procedures before sales.

Version control and next steps

WS-1.4 adopts WRI Volumetric Water Benefit Accounting 2.0 as the reference method for quantifying volume benefits. It is a quantification method only: it adds a reporting requirement and does not change or lower any eligibility test. WS-1.4 retains in full the WS-1.3 additionality ruling (five tests for every credited activity, proportional crediting where funding is shared, a common-practice check, benefit labels limiting claims to the benefit type and location, and written, archived reasons for desalination decisions) and the WS-1.2 requirements for public utilities, continued-operation claims and desalination. Approved by WaterSwap management 23 November 2026; applies to new submissions using this version when published. WS-1.3, WS-1.2, WS-1.1, WS-1.0 and earlier drafts are preserved unchanged in the archive. No effective issuance date has been set. WaterSwap management approves revisions with documented evidence, reasons, effective scope and transition arrangements. Publish a version number, effective date and change summary and preserve the previous rules before a revision takes effect. Earlier applications retain their recorded version unless amended and resubmitted; migration requires a recorded explanation and notice. Future issued batches must retain their original rule and methodology versions. Later changes must not silently rewrite purchases or extinguish rights; corrections follow the published correction process. Public feedback informs decisions but does not give any contributor a veto. Whole-rulebook external approval is not a condition of revision; independent project verification and applicable legal requirements remain mandatory.

WS-1.4 launch requirements

  1. Confirm the issuing legal entity, governance, insurance and contractual responsibilities in Australia, New Zealand and the United States.
  2. WaterSwap must adopt and publish a versioned, evidence-based methodology for each eligible benefit type and jurisdiction, with equations, source references, assumptions and limitations. Exclude activities where a defensible method is not established.
  3. Approve eligibility criteria for owner-appointed independent verifiers and appoint an issuance decision-maker separated from project development and sales.
  4. Document applicable requirements for claims, permits, benefit ownership, consumer rights, taxation and any financial-services implications. Resolve material legal uncertainties through targeted advice where needed; whole-rulebook external approval is not a WaterSwap prerequisite.
  5. Validate a real pilot with monitoring data, additionality, safeguards, independent verification and closed findings.
  6. Implement and independently test live serial allocation, quantity reconciliation, transfers, irreversible retirement, corrections and reversal handling before enabling issuance.
  7. Approve buyer contracts, permitted claims, complaints/appeals arrangements, fees and a continuity plan for registry records.
WS-1.3 · Additionality ruling adopted (archived)

Adopted . Superseded by WS-1.4 for new submissions using that version. Its additionality ruling is carried forward unchanged into WS-1.4. Preserved unchanged below.

WaterSwap credits only water that would not exist, or would not stay in the environment, without the buyer’s support. Every credited activity must pass five tests: a defined activity, a conservative baseline, not already required or paid for, support that makes the difference, and claimed once only. Being new is not enough on its own. Shared funding is credited in proportion to each contribution, credits are measured in water rather than dollars, a common-practice check applies, and every credit carries a benefit label that limits claims to its type and location. Desalination applicants receive written reasons for each decision, and those reasons are archived.

Scope and status

WaterSwap aims to build an internationally credible voluntary water-benefit programme, starting in Australia, New Zealand and the United States. International partnership and buyer enquiries are welcome; project applications currently cover Australia, New Zealand and the United States only. Expansion requires jurisdiction-specific scientific and legal review, approved methodologies and local safeguards. WaterSwap owns and adopts this voluntary governance and application-screening framework. It is not a government-authorised regulatory or offset scheme; it does not override applicable laws, permits or third-party rights. Adoption of this framework is not approval of a credit calculation methodology. Project registration, an enquiry, a pledge or a draft certificate does not create a water credit. No affiliation, accreditation or endorsement by ISO, WRI or another standard owner is claimed.

Buyer briefs and project matching

WaterSwap works on behalf of large water users, such as data centres, to find suitable projects, in the way a recruitment agency works for an employer. A buyer may submit a brief describing its sites, catchments, reporting frameworks and additional criteria. Project owners carry the onus of demonstrating, with evidence, that their project meets the WaterSwap minimum and a brief. WaterSwap may present matching projects to a buyer as a shortlist. Buyer criteria may add requirements or narrow a portfolio; they never lower the WaterSwap minimum. Buyers choose which eligible projects to support, but do not decide eligibility, verified quantities or programme rules. WaterSwap’s commercial relationship with buyers must not influence eligibility decisions. A match, shortlist or expression of interest is not credit issuance or a purchase commitment. Research performance alone never generates credits.

Accountability and conflicts of interest

WaterSwap management owns the programme, approves its rules and is accountable for their application. WaterSwap has a commercial interest in future credit sales; that interest must not determine eligibility or verified quantities. Record financial, ownership and advisory conflicts for each decision. Anyone with a project-specific conflict must withdraw from the decision. Before issuance begins, name an authorised decision-maker separated from project development and sales and record their approval reasons. Where no unconflicted decision-maker is available, pause the decision and arrange independent escalation. Independent project verification is separate from WaterSwap rule ownership; no external governance board or accreditation is claimed.

Evidence, assumptions and limitations

Use published scientific guidance and official regulatory guidance as evidence, not as endorsement or a substitute for project-specific advice. Record source titles, versions or publication dates, the provisions used, local applicability and departures in each methodology. Legal commentary is not advice specifically given to WaterSwap. General reference guidance below does not yet establish a complete credit methodology. No universal conversion factor, credit denomination or desalination eligibility formula is settled. Update evidence openly as knowledge develops; unresolved material uncertainty prevents issuance for the affected activity.

Units and local relevance

Water-volume benefits and water-quality improvements are different products. Volumetric calculations should report m³; pollutant reductions should report the identified pollutant and mass. There is no approved WaterSwap credit denomination or conversion factor yet. Do not treat water from different catchments, time periods or benefit types as interchangeable. Volume alone does not establish a broader ecological outcome.

Eligibility and additionality

Require documented rights to deliver and assign the benefit, valid local consents, a mapped boundary, a conservative baseline, additionality, funding attribution and no duplicate claims. Disclose public funding and legally required activities. Reject unsupported ownership, overlapping claims and benefits already assigned elsewhere. Existing projects require evidence that any proposed credited component is genuinely additional. Additionality ruling: WaterSwap credits only water that would not exist, or would not remain in the environment, without the buyer’s support. Being new is not enough on its own; a new plant, scheme or works already approved and funded would occur anyway and is not additional. Every credited activity must pass five tests. (1) Defined activity: a specific activity and benefit period is assessed, never the whole output of a facility. (2) Conservative baseline: a credible without-support scenario is evidenced from metered records, budgets and operating plans, and the lower figure is used where doubt remains. (3) Not required or already paid for: anything required by law, licence, consent or contract, or already funded by tariffs, budgets, grants or supply contracts, is excluded. (4) Support makes the difference: open-book evidence must show the buyer’s contribution enables the activity to proceed, to be larger, or to occur earlier; only the enabled increment or the brought-forward period is credited. (5) Claimed once: the same benefit may not be claimed on another registry, sold to another party or counted in another party’s reported claim. Where several parties fund an activity, a buyer’s credited share is proportional to its contribution unless the other funders waive their claim in writing. Contributions that are repaid or earn a commercial return reduce or remove the credited share. Credits are measured in water, never in dollars contributed. A common-practice check applies: where most comparable facilities in the region already undertake the activity, it is treated as business as usual unless strong evidence shows otherwise. A buyer that uses the funded water itself is purchasing supply, not an offset; the same water cannot be both. Every decision records which tests were passed and why, and is re-tested at renewal; a benefit credited in one period cannot be credited again. Research performance alone never generates credits.

Public utilities and existing assets

Screening policy: public ownership, public co-funding or an existing asset is not an automatic exclusion. Assess a defined activity and benefit period, not the ownership category or the entire plant. New capacity, efficiency upgrades or continued operation may be considered only where evidence shows a positive change against a credible without-support scenario. Review committed budgets, grants, tariffs, supply contracts, operating obligations and other claims. Funding allocation alone does not prove additionality. Do not sell routine, already-funded or already-assigned outcomes again. Continued-operation (avoided-loss) claims carry a heightened burden of proof: require audited or independently reviewed financial statements and an open-book cash-flow forecast showing a shortfall that would cause shutdown or material output loss within a defined period, or a formal closure, decommissioning or service-reduction notice or resolution. Show that tariff, budget, insurance, warranty, grant and lender options have been considered. Routine or scheduled maintenance, maintenance the operator is already obliged or funded to perform, and cost overruns do not qualify. Credited quantities are limited to output that would otherwise be lost during the supported period, and support must be tied to the specific works or operation identified. Where compliance duties are involved, document the genuinely incremental component and seek targeted specialist advice on material unresolved questions; no automatic exemption applies. WaterSwap makes the eligibility decision and records its evidence and reasoning.

Desalination and data-centre partnerships

Desalination proposals may enter screening; this is not approval for credits. Define the benefit being claimed: improved water access, increased supply resilience or reduced freshwater pressure must not be conflated. Where freshwater displacement is claimed, demonstrate the reduction in abstraction or consumption, its location, timing, beneficiaries and durability; desalinated output alone is insufficient. A displacement claim also requires an enforceable mechanism, for the whole benefit period, that prevents the conserved freshwater being taken up by another user: for example a recorded forbearance or non-use agreement, a dedication or transfer to instream or environmental flow, a permanent or term reduction in a licence or allocation, or documented retention under an adjudicated-basin or groundwater-sustainability accounting framework, as applicable in the jurisdiction. The mechanism must be capable of independent verification. Without it, the benefit may be described only as supply resilience or improved access, not freshwater displacement. Assess intake impacts, brine and chemical discharges, energy and emissions, community access, permits and monitoring. Brine and other discharges must hold current permits from the relevant authorities (in California, for example, discharge permits and the State Water Resources Control Board’s Ocean Plan desalination requirements), supported by recent compliance monitoring; unresolved material non-compliance prevents eligibility. Report the energy source, energy intensity (kWh per m³) and associated emissions. Water benefits and emissions are not netted against each other: energy impacts are disclosed alongside the water claim, a project must not be described as low-emission or carbon-neutral unless separately evidenced, and buyers remain responsible for their own emissions accounting. A data centre buying its normal water supply does not automatically create a separate offset. Distinguish contractual or approval-related obligations from voluntary contributions, account for new demand and backup supplies, and document who may claim each benefit. Consider recycled water and demand reduction alongside desalination; choose the option supported by local evidence. Every credit carries a benefit label, such as improved water access, supply resilience or freshwater retained in a named catchment. Buyers may only make claims matching that label and location: a water-access benefit in one region cannot be presented as offsetting water use in another catchment. Desalination applications are decided by WaterSwap’s Head of Programme Integrity. Each applicant receives the decision and written reasons identifying the tests passed or failed, and the decision and reasons are archived unchanged. An applicant may appeal through the published grievance process.

Measurement and methodology

WaterSwap is responsible for adopting project-type-specific equations, data sources, counterfactual assumptions, uncertainty deductions, leakage, attribution and monitoring using documented scientific evidence. Publish the sources, units, applicability and limitations with each method. External approval of the entire rulebook is not required by this framework. Independent project verification must still assess whether the method is appropriate and the claimed calculation is supported. Where science is unresolved, defer the activity rather than invent a conversion factor. Estimated future benefits must be kept separate from measured benefits. Proposed issuance is ex-post only, after independent verification of the specified benefit period. No arbitrary conversion of restoration hectares or pollutant mass into water volume is permitted.

Verification and governance

The project owner is responsible for commissioning and paying a competent independent verifier and providing the signed report, credential evidence and underlying data. WaterSwap must check report authenticity with the verifier, credential validity and relevant scope, independence, the methodology used and closure of material findings. A separate authorised decision-maker considers issuance. Payment by the owner must be disclosed; contingent fees and verification of a verifier’s own project work are not acceptable under this framework. There is no assumed universal water-credit verifier licence: applicable licensing, accreditation or scheme approval must be checked for the jurisdiction and method. Owner-provided certification does not automatically qualify a project or transfer WaterSwap’s responsibility for its issuance decision.

Australian, New Zealand and United States checks

Assess project-specific obligations using applicable official guidance and scientific evidence; obtain targeted advice when a material question remains unresolved. In Australia, assess relevant state/territory water rights, planning/environmental approvals and Aboriginal and Torres Strait Islander interests. In New Zealand, assess applicable resource consents, water rights and Māori, iwi and hapū rights and interests. In the United States, water law differs by state: assess the applicable state water rights and permits (for example, State Water Resources Control Board requirements in California), federal and state discharge and environmental permits including those covering desalination intake and brine, and Tribal water rights and interests. This framework does not determine consent requirements or substitute for required engagement, permits or project-specific legal advice.

Safeguards and grievances

Evaluate downstream effects, biodiversity, water access, displacement and impacts on communities before acceptance. Record consultation and unresolved concerns. Complaints may be submitted through the contact form with the project reference. WaterSwap management is accountable for receiving and assigning complaints. Record the issue, evidence, conflicts, decision and reasons; an appeal must be considered by someone not involved in the original decision. Before sales begin, publish the responsible roles and response timetable and arrange independent escalation where an unconflicted reviewer is unavailable. No response deadline is currently promised.

Registry and issuance controls

The intended live registry must link every serialised unit to a project, methodology/version, geography, benefit period, verified quantity and supporting report. It must prevent over-issuance, duplicate period allocation and double retirement, with transactional reconciliation and an audit history. The current platform stores screening records and private draft certificates only; live issuance, transfers and retirement are not implemented or enabled.

Certificates and permitted claims

A future claim certificate should identify the beneficiary and specific retired units, with a public status record and carefully qualified claim wording. Retirement—not a pledge or a printable document—would be the basis for an exclusive benefit claim. Do not claim carbon neutrality, water neutrality, water positivity, regulatory compliance or a water entitlement merely by holding a certificate. Even verified volume is not proof of equivalence to a buyer’s footprint.

Benefit periods and renewal

Record the actual start and end dates of the benefit period separately from the certificate issue date. A 12-month reporting cycle may be adopted after review, but it must not recycle an already claimed benefit. Renewal, if offered, requires newly eligible and verified benefits and new retirement records. No automatic renewals or payments are enabled; term and commercial policy remain to be decided.

Corrections, reversals and continuity

When credible evidence challenges a benefit, pause the affected application or, once transactions exist, the affected unsold inventory and issuance while investigating. Preserve the original evidence, record the findings and correction, notify affected parties, and disclose material registry status changes without exposing private data. Replacement or refund obligations must be established in sale terms before any purchase; this framework does not invent an unconditional guarantee or waive statutory rights. Set any uncertainty or reversal buffer from evidence, not by copying another programme. Preserve original records and append corrections; never silently rewrite issued certificates. Finalise operational cancellation, notification, backup and registry continuity procedures before sales.

Version control and next steps

WS-1.3 adopts WaterSwap’s additionality ruling: five tests for every credited activity, proportional crediting where funding is shared, a common-practice check, benefit labels limiting claims to the benefit type and location, and written, archived reasons for desalination decisions. It retains the WS-1.2 requirements for public utilities, continued-operation claims and desalination. Approved by WaterSwap management 22 November 2026; applies to new submissions using this version when published. WS-1.2, WS-1.1, WS-1.0 and earlier drafts are preserved unchanged in the archive. No effective issuance date has been set. WaterSwap management approves revisions with documented evidence, reasons, effective scope and transition arrangements. Publish a version number, effective date and change summary and preserve the previous rules before a revision takes effect. Earlier applications retain their recorded version unless amended and resubmitted; migration requires a recorded explanation and notice. Future issued batches must retain their original rule and methodology versions. Later changes must not silently rewrite purchases or extinguish rights; corrections follow the published correction process. Public feedback informs decisions but does not give any contributor a veto. Whole-rulebook external approval is not a condition of revision; independent project verification and applicable legal requirements remain mandatory.

WS-1.3 launch requirements

  1. Confirm the issuing legal entity, governance, insurance and contractual responsibilities in Australia, New Zealand and the United States.
  2. WaterSwap must adopt and publish a versioned, evidence-based methodology for each eligible benefit type and jurisdiction, with equations, source references, assumptions and limitations. Exclude activities where a defensible method is not established.
  3. Approve eligibility criteria for owner-appointed independent verifiers and appoint an issuance decision-maker separated from project development and sales.
  4. Document applicable requirements for claims, permits, benefit ownership, consumer rights, taxation and any financial-services implications. Resolve material legal uncertainties through targeted advice where needed; whole-rulebook external approval is not a WaterSwap prerequisite.
  5. Validate a real pilot with monitoring data, additionality, safeguards, independent verification and closed findings.
  6. Implement and independently test live serial allocation, quantity reconciliation, transfers, irreversible retirement, corrections and reversal handling before enabling issuance.
  7. Approve buyer contracts, permitted claims, complaints/appeals arrangements, fees and a continuity plan for registry records.
WS-1.2 · Utilities, continued operation and desalination tightened (archived)

Adopted . Superseded by WS-1.3 for new submissions using that version. Preserved unchanged below.

Freshwater-displacement claims now need an enforceable mechanism, such as a forbearance agreement, instream dedication or licence reduction, so the saved water cannot be taken by another user. Continued-operation claims need audited financial proof of a shortfall or a formal closure notice; routine maintenance does not qualify. Desalination must hold current brine-discharge permits and disclose energy source, intensity and emissions, which are reported alongside and never netted against the water benefit.

Scope and status

WaterSwap aims to build an internationally credible voluntary water-benefit programme, starting in Australia, New Zealand and the United States. International partnership and buyer enquiries are welcome; project applications currently cover Australia, New Zealand and the United States only. Expansion requires jurisdiction-specific scientific and legal review, approved methodologies and local safeguards. WaterSwap owns and adopts this voluntary governance and application-screening framework. It is not a government-authorised regulatory or offset scheme; it does not override applicable laws, permits or third-party rights. Adoption of this framework is not approval of a credit calculation methodology. Project registration, an enquiry, a pledge or a draft certificate does not create a water credit. No affiliation, accreditation or endorsement by ISO, WRI or another standard owner is claimed.

Buyer briefs and project matching

WaterSwap works on behalf of large water users, such as data centres, to find suitable projects, in the way a recruitment agency works for an employer. A buyer may submit a brief describing its sites, catchments, reporting frameworks and additional criteria. Project owners carry the onus of demonstrating, with evidence, that their project meets the WaterSwap minimum and a brief. WaterSwap may present matching projects to a buyer as a shortlist. Buyer criteria may add requirements or narrow a portfolio; they never lower the WaterSwap minimum. Buyers choose which eligible projects to support, but do not decide eligibility, verified quantities or programme rules. WaterSwap’s commercial relationship with buyers must not influence eligibility decisions. A match, shortlist or expression of interest is not credit issuance or a purchase commitment. Research performance alone never generates credits.

Accountability and conflicts of interest

WaterSwap management owns the programme, approves its rules and is accountable for their application. WaterSwap has a commercial interest in future credit sales; that interest must not determine eligibility or verified quantities. Record financial, ownership and advisory conflicts for each decision. Anyone with a project-specific conflict must withdraw from the decision. Before issuance begins, name an authorised decision-maker separated from project development and sales and record their approval reasons. Where no unconflicted decision-maker is available, pause the decision and arrange independent escalation. Independent project verification is separate from WaterSwap rule ownership; no external governance board or accreditation is claimed.

Evidence, assumptions and limitations

Use published scientific guidance and official regulatory guidance as evidence, not as endorsement or a substitute for project-specific advice. Record source titles, versions or publication dates, the provisions used, local applicability and departures in each methodology. Legal commentary is not advice specifically given to WaterSwap. General reference guidance below does not yet establish a complete credit methodology. No universal conversion factor, credit denomination or desalination eligibility formula is settled. Update evidence openly as knowledge develops; unresolved material uncertainty prevents issuance for the affected activity.

Units and local relevance

Water-volume benefits and water-quality improvements are different products. Volumetric calculations should report m³; pollutant reductions should report the identified pollutant and mass. There is no approved WaterSwap credit denomination or conversion factor yet. Do not treat water from different catchments, time periods or benefit types as interchangeable. Volume alone does not establish a broader ecological outcome.

Eligibility and additionality

Require documented rights to deliver and assign the benefit, valid local consents, a mapped boundary, a conservative baseline, additionality, funding attribution and no duplicate claims. Disclose public funding and legally required activities. Reject unsupported ownership, overlapping claims and benefits already assigned elsewhere. Existing projects require evidence that any proposed credited component is genuinely additional.

Public utilities and existing assets

Screening policy: public ownership, public co-funding or an existing asset is not an automatic exclusion. Assess a defined activity and benefit period, not the ownership category or the entire plant. New capacity, efficiency upgrades or continued operation may be considered only where evidence shows a positive change against a credible without-support scenario. Review committed budgets, grants, tariffs, supply contracts, operating obligations and other claims. Funding allocation alone does not prove additionality. Do not sell routine, already-funded or already-assigned outcomes again. Continued-operation (avoided-loss) claims carry a heightened burden of proof: require audited or independently reviewed financial statements and an open-book cash-flow forecast showing a shortfall that would cause shutdown or material output loss within a defined period, or a formal closure, decommissioning or service-reduction notice or resolution. Show that tariff, budget, insurance, warranty, grant and lender options have been considered. Routine or scheduled maintenance, maintenance the operator is already obliged or funded to perform, and cost overruns do not qualify. Credited quantities are limited to output that would otherwise be lost during the supported period, and support must be tied to the specific works or operation identified. Where compliance duties are involved, document the genuinely incremental component and seek targeted specialist advice on material unresolved questions; no automatic exemption applies. WaterSwap makes the eligibility decision and records its evidence and reasoning.

Desalination and data-centre partnerships

Desalination proposals may enter screening; this is not approval for credits. Define the benefit being claimed: improved water access, increased supply resilience or reduced freshwater pressure must not be conflated. Where freshwater displacement is claimed, demonstrate the reduction in abstraction or consumption, its location, timing, beneficiaries and durability; desalinated output alone is insufficient. A displacement claim also requires an enforceable mechanism, for the whole benefit period, that prevents the conserved freshwater being taken up by another user: for example a recorded forbearance or non-use agreement, a dedication or transfer to instream or environmental flow, a permanent or term reduction in a licence or allocation, or documented retention under an adjudicated-basin or groundwater-sustainability accounting framework, as applicable in the jurisdiction. The mechanism must be capable of independent verification. Without it, the benefit may be described only as supply resilience or improved access, not freshwater displacement. Assess intake impacts, brine and chemical discharges, energy and emissions, community access, permits and monitoring. Brine and other discharges must hold current permits from the relevant authorities (in California, for example, discharge permits and the State Water Resources Control Board’s Ocean Plan desalination requirements), supported by recent compliance monitoring; unresolved material non-compliance prevents eligibility. Report the energy source, energy intensity (kWh per m³) and associated emissions. Water benefits and emissions are not netted against each other: energy impacts are disclosed alongside the water claim, a project must not be described as low-emission or carbon-neutral unless separately evidenced, and buyers remain responsible for their own emissions accounting. A data centre buying its normal water supply does not automatically create a separate offset. Distinguish contractual or approval-related obligations from voluntary contributions, account for new demand and backup supplies, and document who may claim each benefit. Consider recycled water and demand reduction alongside desalination; choose the option supported by local evidence.

Measurement and methodology

WaterSwap is responsible for adopting project-type-specific equations, data sources, counterfactual assumptions, uncertainty deductions, leakage, attribution and monitoring using documented scientific evidence. Publish the sources, units, applicability and limitations with each method. External approval of the entire rulebook is not required by this framework. Independent project verification must still assess whether the method is appropriate and the claimed calculation is supported. Where science is unresolved, defer the activity rather than invent a conversion factor. Estimated future benefits must be kept separate from measured benefits. Proposed issuance is ex-post only, after independent verification of the specified benefit period. No arbitrary conversion of restoration hectares or pollutant mass into water volume is permitted.

Verification and governance

The project owner is responsible for commissioning and paying a competent independent verifier and providing the signed report, credential evidence and underlying data. WaterSwap must check report authenticity with the verifier, credential validity and relevant scope, independence, the methodology used and closure of material findings. A separate authorised decision-maker considers issuance. Payment by the owner must be disclosed; contingent fees and verification of a verifier’s own project work are not acceptable under this framework. There is no assumed universal water-credit verifier licence: applicable licensing, accreditation or scheme approval must be checked for the jurisdiction and method. Owner-provided certification does not automatically qualify a project or transfer WaterSwap’s responsibility for its issuance decision.

Australian, New Zealand and United States checks

Assess project-specific obligations using applicable official guidance and scientific evidence; obtain targeted advice when a material question remains unresolved. In Australia, assess relevant state/territory water rights, planning/environmental approvals and Aboriginal and Torres Strait Islander interests. In New Zealand, assess applicable resource consents, water rights and Māori, iwi and hapū rights and interests. In the United States, water law differs by state: assess the applicable state water rights and permits (for example, State Water Resources Control Board requirements in California), federal and state discharge and environmental permits including those covering desalination intake and brine, and Tribal water rights and interests. This framework does not determine consent requirements or substitute for required engagement, permits or project-specific legal advice.

Safeguards and grievances

Evaluate downstream effects, biodiversity, water access, displacement and impacts on communities before acceptance. Record consultation and unresolved concerns. Complaints may be submitted through the contact form with the project reference. WaterSwap management is accountable for receiving and assigning complaints. Record the issue, evidence, conflicts, decision and reasons; an appeal must be considered by someone not involved in the original decision. Before sales begin, publish the responsible roles and response timetable and arrange independent escalation where an unconflicted reviewer is unavailable. No response deadline is currently promised.

Registry and issuance controls

The intended live registry must link every serialised unit to a project, methodology/version, geography, benefit period, verified quantity and supporting report. It must prevent over-issuance, duplicate period allocation and double retirement, with transactional reconciliation and an audit history. The current platform stores screening records and private draft certificates only; live issuance, transfers and retirement are not implemented or enabled.

Certificates and permitted claims

A future claim certificate should identify the beneficiary and specific retired units, with a public status record and carefully qualified claim wording. Retirement—not a pledge or a printable document—would be the basis for an exclusive benefit claim. Do not claim carbon neutrality, water neutrality, water positivity, regulatory compliance or a water entitlement merely by holding a certificate. Even verified volume is not proof of equivalence to a buyer’s footprint.

Benefit periods and renewal

Record the actual start and end dates of the benefit period separately from the certificate issue date. A 12-month reporting cycle may be adopted after review, but it must not recycle an already claimed benefit. Renewal, if offered, requires newly eligible and verified benefits and new retirement records. No automatic renewals or payments are enabled; term and commercial policy remain to be decided.

Corrections, reversals and continuity

When credible evidence challenges a benefit, pause the affected application or, once transactions exist, the affected unsold inventory and issuance while investigating. Preserve the original evidence, record the findings and correction, notify affected parties, and disclose material registry status changes without exposing private data. Replacement or refund obligations must be established in sale terms before any purchase; this framework does not invent an unconditional guarantee or waive statutory rights. Set any uncertainty or reversal buffer from evidence, not by copying another programme. Preserve original records and append corrections; never silently rewrite issued certificates. Finalise operational cancellation, notification, backup and registry continuity procedures before sales.

Version control and next steps

WS-1.2 tightens the rules for public utilities, continued-operation claims and desalination: enforceable protection of displaced freshwater, audited financial proof for avoided-loss claims, and brine-permit and energy-disclosure requirements. Prepared 22 November 2026; applies to new submissions using this version when published. WS-1.1, WS-1.0 and earlier drafts are preserved unchanged in the archive. No effective issuance date has been set. WaterSwap management approves revisions with documented evidence, reasons, effective scope and transition arrangements. Publish a version number, effective date and change summary and preserve the previous rules before a revision takes effect. Earlier applications retain their recorded version unless amended and resubmitted; migration requires a recorded explanation and notice. Future issued batches must retain their original rule and methodology versions. Later changes must not silently rewrite purchases or extinguish rights; corrections follow the published correction process. Public feedback informs decisions but does not give any contributor a veto. Whole-rulebook external approval is not a condition of revision; independent project verification and applicable legal requirements remain mandatory.

WS-1.2 launch requirements

  1. Confirm the issuing legal entity, governance, insurance and contractual responsibilities in Australia, New Zealand and the United States.
  2. WaterSwap must adopt and publish a versioned, evidence-based methodology for each eligible benefit type and jurisdiction, with equations, source references, assumptions and limitations. Exclude activities where a defensible method is not established.
  3. Approve eligibility criteria for owner-appointed independent verifiers and appoint an issuance decision-maker separated from project development and sales.
  4. Document applicable requirements for claims, permits, benefit ownership, consumer rights, taxation and any financial-services implications. Resolve material legal uncertainties through targeted advice where needed; whole-rulebook external approval is not a WaterSwap prerequisite.
  5. Validate a real pilot with monitoring data, additionality, safeguards, independent verification and closed findings.
  6. Implement and independently test live serial allocation, quantity reconciliation, transfers, irreversible retirement, corrections and reversal handling before enabling issuance.
  7. Approve buyer contracts, permitted claims, complaints/appeals arrangements, fees and a continuity plan for registry records.
WS-1.1 · United States scope and buyer matching (archived)

Adopted . Superseded by WS-1.2 for new submissions using that version. Extended screening to the United States and added buyer briefs and project matching. Preserved unchanged below.

Scope and status

WaterSwap aims to build an internationally credible voluntary water-benefit programme, starting in Australia, New Zealand and the United States. International partnership and buyer enquiries are welcome; project applications currently cover Australia, New Zealand and the United States only. Expansion requires jurisdiction-specific scientific and legal review, approved methodologies and local safeguards. WaterSwap owns and adopts this voluntary governance and application-screening framework. It is not a government-authorised regulatory or offset scheme; it does not override applicable laws, permits or third-party rights. Adoption of this framework is not approval of a credit calculation methodology. Project registration, an enquiry, a pledge or a draft certificate does not create a water credit. No affiliation, accreditation or endorsement by ISO, WRI or another standard owner is claimed.

Buyer briefs and project matching

WaterSwap works on behalf of large water users, such as data centres, to find suitable projects, in the way a recruitment agency works for an employer. A buyer may submit a brief describing its sites, catchments, reporting frameworks and additional criteria. Project owners carry the onus of demonstrating, with evidence, that their project meets the WaterSwap minimum and a brief. WaterSwap may present matching projects to a buyer as a shortlist. Buyer criteria may add requirements or narrow a portfolio; they never lower the WaterSwap minimum. Buyers choose which eligible projects to support, but do not decide eligibility, verified quantities or programme rules. WaterSwap’s commercial relationship with buyers must not influence eligibility decisions. A match, shortlist or expression of interest is not credit issuance or a purchase commitment. Research performance alone never generates credits.

Accountability and conflicts of interest

WaterSwap management owns the programme, approves its rules and is accountable for their application. WaterSwap has a commercial interest in future credit sales; that interest must not determine eligibility or verified quantities. Record financial, ownership and advisory conflicts for each decision. Anyone with a project-specific conflict must withdraw from the decision. Before issuance begins, name an authorised decision-maker separated from project development and sales and record their approval reasons. Where no unconflicted decision-maker is available, pause the decision and arrange independent escalation. Independent project verification is separate from WaterSwap rule ownership; no external governance board or accreditation is claimed.

Evidence, assumptions and limitations

Use published scientific guidance and official regulatory guidance as evidence, not as endorsement or a substitute for project-specific advice. Record source titles, versions or publication dates, the provisions used, local applicability and departures in each methodology. Legal commentary is not advice specifically given to WaterSwap. General reference guidance below does not yet establish a complete credit methodology. No universal conversion factor, credit denomination or desalination eligibility formula is settled. Update evidence openly as knowledge develops; unresolved material uncertainty prevents issuance for the affected activity.

Units and local relevance

Water-volume benefits and water-quality improvements are different products. Volumetric calculations should report m³; pollutant reductions should report the identified pollutant and mass. There is no approved WaterSwap credit denomination or conversion factor yet. Do not treat water from different catchments, time periods or benefit types as interchangeable. Volume alone does not establish a broader ecological outcome.

Eligibility and additionality

Require documented rights to deliver and assign the benefit, valid local consents, a mapped boundary, a conservative baseline, additionality, funding attribution and no duplicate claims. Disclose public funding and legally required activities. Reject unsupported ownership, overlapping claims and benefits already assigned elsewhere. Existing projects require evidence that any proposed credited component is genuinely additional.

Public utilities and existing assets

Screening policy: public ownership, public co-funding or an existing asset is not an automatic exclusion. Assess a defined activity and benefit period, not the ownership category or the entire plant. New capacity, efficiency upgrades or continued operation may be considered only where evidence shows a positive change against a credible without-support scenario. Review committed budgets, grants, tariffs, supply contracts, operating obligations and other claims. Funding allocation alone does not prove additionality. Do not sell routine, already-funded or already-assigned outcomes again. Where compliance duties are involved, document the genuinely incremental component and seek targeted specialist advice on material unresolved questions; no automatic exemption applies. WaterSwap makes the eligibility decision and records its evidence and reasoning.

Desalination and data-centre partnerships

Desalination proposals may enter screening; this is not approval for credits. Define the benefit being claimed: improved water access, increased supply resilience or reduced freshwater pressure must not be conflated. Where freshwater displacement is claimed, demonstrate the reduction in abstraction or consumption, its location, timing, beneficiaries and durability; desalinated output alone is insufficient. Assess intake impacts, brine and chemical discharges, energy and emissions, community access, permits and monitoring. A data centre buying its normal water supply does not automatically create a separate offset. Distinguish contractual or approval-related obligations from voluntary contributions, account for new demand and backup supplies, and document who may claim each benefit. Consider recycled water and demand reduction alongside desalination; choose the option supported by local evidence.

Measurement and methodology

WaterSwap is responsible for adopting project-type-specific equations, data sources, counterfactual assumptions, uncertainty deductions, leakage, attribution and monitoring using documented scientific evidence. Publish the sources, units, applicability and limitations with each method. External approval of the entire rulebook is not required by this framework. Independent project verification must still assess whether the method is appropriate and the claimed calculation is supported. Where science is unresolved, defer the activity rather than invent a conversion factor. Estimated future benefits must be kept separate from measured benefits. Proposed issuance is ex-post only, after independent verification of the specified benefit period. No arbitrary conversion of restoration hectares or pollutant mass into water volume is permitted.

Verification and governance

The project owner is responsible for commissioning and paying a competent independent verifier and providing the signed report, credential evidence and underlying data. WaterSwap must check report authenticity with the verifier, credential validity and relevant scope, independence, the methodology used and closure of material findings. A separate authorised decision-maker considers issuance. Payment by the owner must be disclosed; contingent fees and verification of a verifier’s own project work are not acceptable under this framework. There is no assumed universal water-credit verifier licence: applicable licensing, accreditation or scheme approval must be checked for the jurisdiction and method. Owner-provided certification does not automatically qualify a project or transfer WaterSwap’s responsibility for its issuance decision.

Australian, New Zealand and United States checks

Assess project-specific obligations using applicable official guidance and scientific evidence; obtain targeted advice when a material question remains unresolved. In Australia, assess relevant state/territory water rights, planning/environmental approvals and Aboriginal and Torres Strait Islander interests. In New Zealand, assess applicable resource consents, water rights and Māori, iwi and hapū rights and interests. In the United States, water law differs by state: assess the applicable state water rights and permits (for example, State Water Resources Control Board requirements in California), federal and state discharge and environmental permits including those covering desalination intake and brine, and Tribal water rights and interests. This framework does not determine consent requirements or substitute for required engagement, permits or project-specific legal advice.

Safeguards and grievances

Evaluate downstream effects, biodiversity, water access, displacement and impacts on communities before acceptance. Record consultation and unresolved concerns. Complaints may be submitted through the contact form with the project reference. WaterSwap management is accountable for receiving and assigning complaints. Record the issue, evidence, conflicts, decision and reasons; an appeal must be considered by someone not involved in the original decision. Before sales begin, publish the responsible roles and response timetable and arrange independent escalation where an unconflicted reviewer is unavailable. No response deadline is currently promised.

Registry and issuance controls

The intended live registry must link every serialised unit to a project, methodology/version, geography, benefit period, verified quantity and supporting report. It must prevent over-issuance, duplicate period allocation and double retirement, with transactional reconciliation and an audit history. The current platform stores screening records and private draft certificates only; live issuance, transfers and retirement are not implemented or enabled.

Certificates and permitted claims

A future claim certificate should identify the beneficiary and specific retired units, with a public status record and carefully qualified claim wording. Retirement—not a pledge or a printable document—would be the basis for an exclusive benefit claim. Do not claim carbon neutrality, water neutrality, water positivity, regulatory compliance or a water entitlement merely by holding a certificate. Even verified volume is not proof of equivalence to a buyer’s footprint.

Benefit periods and renewal

Record the actual start and end dates of the benefit period separately from the certificate issue date. A 12-month reporting cycle may be adopted after review, but it must not recycle an already claimed benefit. Renewal, if offered, requires newly eligible and verified benefits and new retirement records. No automatic renewals or payments are enabled; term and commercial policy remain to be decided.

Corrections, reversals and continuity

When credible evidence challenges a benefit, pause the affected application or, once transactions exist, the affected unsold inventory and issuance while investigating. Preserve the original evidence, record the findings and correction, notify affected parties, and disclose material registry status changes without exposing private data. Replacement or refund obligations must be established in sale terms before any purchase; this framework does not invent an unconditional guarantee or waive statutory rights. Set any uncertainty or reversal buffer from evidence, not by copying another programme. Preserve original records and append corrections; never silently rewrite issued certificates. Finalise operational cancellation, notification, backup and registry continuity procedures before sales.

Version control and next steps

WS-1.1 extends WaterSwap-owned governance and application-screening rules to the United States and adds buyer briefs and project matching. Prepared 22 November 2026; applies to new submissions using this version when published. WS-1.0 is preserved unchanged in the archive. No effective issuance date has been set. WaterSwap management approves revisions with documented evidence, reasons, effective scope and transition arrangements. Publish a version number, effective date and change summary and preserve the previous rules before a revision takes effect. Earlier applications retain their recorded version unless amended and resubmitted; migration requires a recorded explanation and notice. Future issued batches must retain their original rule and methodology versions. Later changes must not silently rewrite purchases or extinguish rights; corrections follow the published correction process. Public feedback informs decisions but does not give any contributor a veto. Whole-rulebook external approval is not a condition of revision; independent project verification and applicable legal requirements remain mandatory.

WS-1.1 launch requirements

  1. Confirm the issuing legal entity, governance, insurance and contractual responsibilities in Australia, New Zealand and the United States.
  2. WaterSwap must adopt and publish a versioned, evidence-based methodology for each eligible benefit type and jurisdiction, with equations, source references, assumptions and limitations. Exclude activities where a defensible method is not established.
  3. Approve eligibility criteria for owner-appointed independent verifiers and appoint an issuance decision-maker separated from project development and sales.
  4. Document applicable requirements for claims, permits, benefit ownership, consumer rights, taxation and any financial-services implications. Resolve material legal uncertainties through targeted advice where needed; whole-rulebook external approval is not a WaterSwap prerequisite.
  5. Validate a real pilot with monitoring data, additionality, safeguards, independent verification and closed findings.
  6. Implement and independently test live serial allocation, quantity reconciliation, transfers, irreversible retirement, corrections and reversal handling before enabling issuance.
  7. Approve buyer contracts, permitted claims, complaints/appeals arrangements, fees and a continuity plan for registry records.
WS-1.0 · Read the archived governance and application-screening framework

Superseded by WS-1.1 for new submissions using that version. Prepared 19 November 2026 and preserved unchanged below. WS-1.0 replaced the blanket external rulebook-approval requirement with WaterSwap-owned adoption, documented evidence and targeted advice where necessary.

Scope and status

WaterSwap aims to build an internationally credible voluntary water-benefit programme, starting in Australia and New Zealand. International partnership and buyer enquiries are welcome; project applications currently cover Australia and New Zealand only. Expansion requires jurisdiction-specific scientific and legal review, approved methodologies and local safeguards. WaterSwap owns and adopts this voluntary governance and application-screening framework. It is not a government-authorised regulatory or offset scheme; it does not override applicable laws, permits or third-party rights. Adoption of this framework is not approval of a credit calculation methodology. Project registration, an enquiry, a pledge or a draft certificate does not create a water credit. No affiliation, accreditation or endorsement by ISO, WRI or another standard owner is claimed.

Accountability and conflicts of interest

WaterSwap management owns the programme, approves its rules and is accountable for their application. WaterSwap has a commercial interest in future credit sales; that interest must not determine eligibility or verified quantities. Record financial, ownership and advisory conflicts for each decision. Anyone with a project-specific conflict must withdraw from the decision. Before issuance begins, name an authorised decision-maker separated from project development and sales and record their approval reasons. Where no unconflicted decision-maker is available, pause the decision and arrange independent escalation. Independent project verification is separate from WaterSwap rule ownership; no external governance board or accreditation is claimed.

Evidence, assumptions and limitations

Use published scientific guidance and official regulatory guidance as evidence, not as endorsement or a substitute for project-specific advice. Record source titles, versions or publication dates, the provisions used, local applicability and departures in each methodology. Legal commentary is not advice specifically given to WaterSwap. General reference guidance below does not yet establish a complete credit methodology. No universal conversion factor, credit denomination or desalination eligibility formula is settled. Update evidence openly as knowledge develops; unresolved material uncertainty prevents issuance for the affected activity.

Units and local relevance

Water-volume benefits and water-quality improvements are different products. Volumetric calculations should report m³; pollutant reductions should report the identified pollutant and mass. There is no approved WaterSwap credit denomination or conversion factor yet. Do not treat water from different catchments, time periods or benefit types as interchangeable. Volume alone does not establish a broader ecological outcome.

Eligibility and additionality

Require documented rights to deliver and assign the benefit, valid local consents, a mapped boundary, a conservative baseline, additionality, funding attribution and no duplicate claims. Disclose public funding and legally required activities. Reject unsupported ownership, overlapping claims and benefits already assigned elsewhere. Existing projects require evidence that any proposed credited component is genuinely additional.

Public utilities and existing assets

Screening policy: public ownership, public co-funding or an existing asset is not an automatic exclusion. Assess a defined activity and benefit period, not the ownership category or the entire plant. New capacity, efficiency upgrades or continued operation may be considered only where evidence shows a positive change against a credible without-support scenario. Review committed budgets, grants, tariffs, supply contracts, operating obligations and other claims. Funding allocation alone does not prove additionality. Do not sell routine, already-funded or already-assigned outcomes again. Where compliance duties are involved, document the genuinely incremental component and seek targeted specialist advice on material unresolved questions; no automatic exemption applies. WaterSwap makes the eligibility decision and records its evidence and reasoning.

Desalination and data-centre partnerships

Desalination proposals may enter screening; this is not approval for credits. Define the benefit being claimed: improved water access, increased supply resilience or reduced freshwater pressure must not be conflated. Where freshwater displacement is claimed, demonstrate the reduction in abstraction or consumption, its location, timing, beneficiaries and durability; desalinated output alone is insufficient. Assess intake impacts, brine and chemical discharges, energy and emissions, community access, permits and monitoring. A data centre buying its normal water supply does not automatically create a separate offset. Distinguish contractual or approval-related obligations from voluntary contributions, account for new demand and backup supplies, and document who may claim each benefit. Consider recycled water and demand reduction alongside desalination; choose the option supported by local evidence.

Measurement and methodology

WaterSwap is responsible for adopting project-type-specific equations, data sources, counterfactual assumptions, uncertainty deductions, leakage, attribution and monitoring using documented scientific evidence. Publish the sources, units, applicability and limitations with each method. External approval of the entire rulebook is not required by this framework. Independent project verification must still assess whether the method is appropriate and the claimed calculation is supported. Where science is unresolved, defer the activity rather than invent a conversion factor. Estimated future benefits must be kept separate from measured benefits. Proposed issuance is ex-post only, after independent verification of the specified benefit period. No arbitrary conversion of restoration hectares or pollutant mass into water volume is permitted.

Verification and governance

The project owner is responsible for commissioning and paying a competent independent verifier and providing the signed report, credential evidence and underlying data. WaterSwap must check report authenticity with the verifier, credential validity and relevant scope, independence, the methodology used and closure of material findings. A separate authorised decision-maker considers issuance. Payment by the owner must be disclosed; contingent fees and verification of a verifier’s own project work are not acceptable under this framework. There is no assumed universal water-credit verifier licence: applicable licensing, accreditation or scheme approval must be checked for the jurisdiction and method. Owner-provided certification does not automatically qualify a project or transfer WaterSwap’s responsibility for its issuance decision.

Australian and New Zealand checks

Assess project-specific obligations using applicable official guidance and scientific evidence; obtain targeted advice when a material question remains unresolved. In Australia, assess relevant state/territory water rights, planning/environmental approvals and Aboriginal and Torres Strait Islander interests. In New Zealand, assess applicable resource consents, water rights and Māori, iwi and hapū rights and interests. This framework does not determine consent requirements or substitute for required engagement, permits or project-specific legal advice.

Safeguards and grievances

Evaluate downstream effects, biodiversity, water access, displacement and impacts on communities before acceptance. Record consultation and unresolved concerns. Complaints may be submitted through the contact form with the project reference. WaterSwap management is accountable for receiving and assigning complaints. Record the issue, evidence, conflicts, decision and reasons; an appeal must be considered by someone not involved in the original decision. Before sales begin, publish the responsible roles and response timetable and arrange independent escalation where an unconflicted reviewer is unavailable. No response deadline is currently promised.

Registry and issuance controls

The intended live registry must link every serialised unit to a project, methodology/version, geography, benefit period, verified quantity and supporting report. It must prevent over-issuance, duplicate period allocation and double retirement, with transactional reconciliation and an audit history. The current platform stores screening records and private draft certificates only; live issuance, transfers and retirement are not implemented or enabled.

Certificates and permitted claims

A future claim certificate should identify the beneficiary and specific retired units, with a public status record and carefully qualified claim wording. Retirement—not a pledge or a printable document—would be the basis for an exclusive benefit claim. Do not claim carbon neutrality, water neutrality, water positivity, regulatory compliance or a water entitlement merely by holding a certificate. Even verified volume is not proof of equivalence to a buyer’s footprint.

Benefit periods and renewal

Record the actual start and end dates of the benefit period separately from the certificate issue date. A 12-month reporting cycle may be adopted after review, but it must not recycle an already claimed benefit. Renewal, if offered, requires newly eligible and verified benefits and new retirement records. No automatic renewals or payments are enabled; term and commercial policy remain to be decided.

Corrections, reversals and continuity

When credible evidence challenges a benefit, pause the affected application or, once transactions exist, the affected unsold inventory and issuance while investigating. Preserve the original evidence, record the findings and correction, notify affected parties, and disclose material registry status changes without exposing private data. Replacement or refund obligations must be established in sale terms before any purchase; this framework does not invent an unconditional guarantee or waive statutory rights. Set any uncertainty or reversal buffer from evidence, not by copying another programme. Preserve original records and append corrections; never silently rewrite issued certificates. Finalise operational cancellation, notification, backup and registry continuity procedures before sales.

Version control and next steps

WS-1.0 establishes WaterSwap-owned governance and application-screening rules. Prepared 19 November 2026; applies to new submissions using this version when published. No effective issuance date has been set. WaterSwap management approves revisions with documented evidence, reasons, effective scope and transition arrangements. Publish a version number, effective date and change summary and preserve the previous rules before a revision takes effect. Earlier applications retain their recorded version unless amended and resubmitted; migration requires a recorded explanation and notice. Future issued batches must retain their original rule and methodology versions. Later changes must not silently rewrite purchases or extinguish rights; corrections follow the published correction process. Public feedback informs decisions but does not give any contributor a veto. Whole-rulebook external approval is not a condition of revision; independent project verification and applicable legal requirements remain mandatory.

WS-1.0 launch requirements

  1. Confirm the issuing legal entity, governance, insurance and contractual responsibilities in Australia and New Zealand.
  2. WaterSwap must adopt and publish a versioned, evidence-based methodology for each eligible benefit type and jurisdiction, with equations, source references, assumptions and limitations. Exclude activities where a defensible method is not established.
  3. Approve eligibility criteria for owner-appointed independent verifiers and appoint an issuance decision-maker separated from project development and sales.
  4. Document applicable requirements for claims, permits, benefit ownership, consumer rights, taxation and any financial-services implications. Resolve material legal uncertainties through targeted advice where needed; whole-rulebook external approval is not a WaterSwap prerequisite.
  5. Validate a real pilot with monitoring data, additionality, safeguards, independent verification and closed findings.
  6. Implement and independently test live serial allocation, quantity reconciliation, transfers, irreversible retirement, corrections and reversal handling before enabling issuance.
  7. Approve buyer contracts, permitted claims, complaints/appeals arrangements, fees and a continuity plan for registry records.
WS-DRAFT-0.2 · Read the archived discussion draft

Superseded by WS-1.0 for new submissions using that version. Preserved unchanged below, including its former review prerequisites. Original effective date was not recorded in this snapshot.

Pre-launch programme. Live credit issuance, sales and retirement are disabled pending independent scientific and legal review.

Scope and status

WaterSwap aims to build an internationally credible voluntary water-benefit programme, starting in Australia and New Zealand. International partnership and buyer enquiries are welcome; project applications currently cover Australia and New Zealand only. Expansion requires jurisdiction-specific scientific and legal review, approved methodologies and local safeguards. This is not an approved standard or government-authorised offset scheme. Project registration, an enquiry, a pledge or a draft certificate does not create a water credit. No affiliation, accreditation or endorsement by ISO, WRI or another standard owner is claimed.

Units and local relevance

Water-volume benefits and water-quality improvements are different products. Volumetric calculations should report m³; pollutant reductions should report the identified pollutant and mass. There is no approved WaterSwap credit denomination or conversion factor yet. Do not treat water from different catchments, time periods or benefit types as interchangeable. Volume alone does not establish a broader ecological outcome.

Eligibility and additionality

Require documented rights to deliver and assign the benefit, valid local consents, a mapped boundary, a conservative baseline, additionality, funding attribution and no duplicate claims. Disclose public funding and legally required activities. Reject unsupported ownership, overlapping claims and benefits already assigned elsewhere. Existing projects require evidence that any proposed credited component is genuinely additional.

Public utilities and existing assets

Draft screening policy: public ownership, public co-funding or an existing asset is not an automatic exclusion. Assess a defined activity and benefit period, not the ownership category or the entire plant. New capacity, efficiency upgrades or continued operation may be considered only where evidence shows a positive change against a credible without-support scenario. Review committed budgets, grants, tariffs, supply contracts, operating obligations and other claims. Funding allocation alone does not prove additionality. Do not sell routine, already-funded or already-assigned outcomes again. Where compliance duties are involved, require legal and scientific assessment of any genuinely incremental component; no automatic exemption applies. This proposed approach remains subject to independent review.

Desalination and data-centre partnerships

Desalination proposals may enter screening; this is not approval for credits. Define the benefit being claimed: improved water access, increased supply resilience or reduced freshwater pressure must not be conflated. Where freshwater displacement is claimed, demonstrate the reduction in abstraction or consumption, its location, timing, beneficiaries and durability; desalinated output alone is insufficient. Assess intake impacts, brine and chemical discharges, energy and emissions, community access, permits and monitoring. A data centre buying its normal water supply does not automatically create a separate offset. Distinguish contractual or approval-related obligations from voluntary contributions, account for new demand and backup supplies, and document who may claim each benefit. Consider recycled water and demand reduction alongside desalination; choose the option supported by local evidence.

Measurement and methodology

A qualified water specialist must approve project-type-specific equations, data sources, counterfactual assumptions, uncertainty deductions, leakage, attribution and monitoring. Estimated future benefits must be kept separate from measured benefits. Proposed issuance is ex-post only, after independent verification of the specified benefit period. No arbitrary conversion of restoration hectares or pollutant mass into water volume is permitted.

Verification and governance

The project owner is responsible for commissioning and paying a competent independent verifier and providing the signed report, credential evidence and underlying data. WaterSwap must check report authenticity with the verifier, credential validity and relevant scope, independence, the methodology used and closure of material findings. A separate authorised decision-maker considers issuance. Payment by the owner must be disclosed; contingent fees and verification of a verifier’s own project work are not acceptable under this draft. There is no assumed universal water-credit verifier licence: applicable licensing, accreditation or scheme approval must be checked for the jurisdiction and method. Owner-provided certification does not automatically qualify a project or transfer WaterSwap’s responsibility for its issuance decision.

Australian and New Zealand checks

Use jurisdiction-specific legal and scientific review. In Australia, assess relevant state/territory water rights, planning/environmental approvals and Aboriginal and Torres Strait Islander interests. In New Zealand, assess applicable resource consents, water rights and Māori, iwi and hapū rights and interests. This draft does not determine consent requirements or substitute for engagement and legal advice.

Safeguards and grievances

Evaluate downstream effects, biodiversity, water access, displacement and impacts on communities before acceptance. Record consultation and unresolved concerns. Complaints may be submitted through the contact form with the project reference. A launch prerequisite is an approved response timetable, independent appeals process and accountable case owner; none is promised by this draft.

Registry and issuance controls

The intended live registry must link every serialised unit to a project, methodology/version, geography, benefit period, verified quantity and supporting report. It must prevent over-issuance, duplicate period allocation and double retirement, with transactional reconciliation and an audit history. The current platform stores screening records and private draft certificates only; live issuance, transfers and retirement are not implemented or enabled.

Certificates and permitted claims

A future claim certificate should identify the beneficiary and specific retired units, with a public status record and carefully qualified claim wording. Retirement—not a pledge or a printable document—would be the basis for an exclusive benefit claim. Do not claim carbon neutrality, water neutrality, water positivity, regulatory compliance or a water entitlement merely by holding a certificate. Even verified volume is not proof of equivalence to a buyer’s footprint.

Benefit periods and renewal

Record the actual start and end dates of the benefit period separately from the certificate issue date. A 12-month reporting cycle may be adopted after review, but it must not recycle an already claimed benefit. Renewal, if offered, requires newly eligible and verified benefits and new retirement records. No automatic renewals or payments are enabled; term and commercial policy remain to be decided.

Corrections, reversals and continuity

Before launch, approve a risk-based policy for uncertainty and reversals, suspension, cancellation, replacements and buyer notifications. Set any buffer scientifically, not by copying another programme. Preserve original records and append corrections; do not silently rewrite issued certificates. Approve retention, backup, access control and registry continuity arrangements before accepting buyers.

Version control and next steps

WS-DRAFT-0.2 is a discussion draft. Change history: WS-DRAFT-0.1 established pre-launch safeguards; WS-DRAFT-0.2 adds proposed activity-level screening for public utilities and existing assets, desalination/data-centre considerations and staged international expansion. Earlier applications retain their recorded programme version and are not automatically approved under revised rules. No effective issuance date has been set. Material changes require documented technical review, legal review and owner approval, with a public change history. Before launch, test a real pilot and the full certificate lifecycle. Referenced guidance informs design but does not certify WaterSwap.

Former launch requirements

  1. Confirm the issuing legal entity, governance, insurance and contractual responsibilities in Australia and New Zealand.
  2. Commission independent scientific review and publish an approved, versioned methodology for each eligible benefit type and jurisdiction.
  3. Approve eligibility criteria for owner-appointed independent verifiers and appoint an issuance decision-maker separated from project development and sales.
  4. Complete legal review of environmental claims, permits, benefit ownership, consumer rights, taxation and any financial-services implications.
  5. Validate a real pilot with monitoring data, additionality, safeguards, independent verification and closed findings.
  6. Implement and independently test live serial allocation, quantity reconciliation, transfers, irreversible retirement, corrections and reversal handling before enabling issuance.
  7. Approve buyer contracts, permitted claims, complaints/appeals arrangements, fees and a continuity plan for registry records.

WS-DRAFT-0.1 introduced the original screening safeguards. The archive above preserves its successor, WS-DRAFT-0.2; a separate full-text WS-DRAFT-0.1 archive is not provided here.

Reference guidance and limitations

These published resources inform the framework. They are not endorsement, accreditation or advice commissioned for WaterSwap. Each future methodology must identify the exact source version and provisions relied on; these general links alone do not validate a credit.

WRI — Volumetric Water Benefit Accounting 2.0September 2025 · Adopted in WS-1.4 as the reference method for quantifying volume benefits; not automatic project eligibility, WaterSwap certification or WRI endorsement.

ACCC — Guide to making environmental claimsAustralian claims guidance. The linked publisher page controls its current edition; not a legal opinion on WaterSwap.

New Zealand Commerce Commission — Environmental claimsNew Zealand claims guidance. The linked publisher page controls its current edition; not approval of a water-credit scheme.

US Federal Trade Commission — Green GuidesUnited States environmental marketing guidance. The linked publisher page controls its current edition; not a legal opinion on WaterSwap. State consumer and water laws also apply.

Questions, objections, appeals or proposed corrections? Contact WaterSwap with the rule version, relevant section, supporting evidence and project reference if applicable. Feedback is reviewed by WaterSwap management; no contributor has a veto over programme decisions.